All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Power grid simulation model for long term operation planning

The result's identifiers

  • Result code in IS VaVaI

    <a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F68407700%3A21230%2F14%3A00221451" target="_blank" >RIV/68407700:21230/14:00221451 - isvavai.cz</a>

  • Result on the web

    <a href="http://dx.doi.org/10.1016/j.applthermaleng.2014.05.064" target="_blank" >http://dx.doi.org/10.1016/j.applthermaleng.2014.05.064</a>

  • DOI - Digital Object Identifier

    <a href="http://dx.doi.org/10.1016/j.applthermaleng.2014.05.064" target="_blank" >10.1016/j.applthermaleng.2014.05.064</a>

Alternative languages

  • Result language

    angličtina

  • Original language name

    Power grid simulation model for long term operation planning

  • Original language description

    In this paper a comprehensive mixed-integer linear programming (MILP) model of transmission network and power plants is presented. The model is capable of forced and regular outage simulation with respect to the spinning reserve requirements. The model formulation includes thermal, pumped-storage and conventional hydro plants as well as renewable resources. Fast and efficient outage scheduling algorithm suitable for prospective studies is presented. We also show how the overall price minimisation can lead to unrealistic pumped-storage plants dispatch and how can this behaviour be corrected using hydrothermal decomposition. To overcome this issue a dedicated MILP water planning model is proposed and its results are compared to the real day production profiles of pumped-storage and conventional hydro plants. The simulation times and results of models with and without hydrothermal decomposition are compared on an annual simulation of Czech transmission network (61 power plants, 110 units

  • Czech name

  • Czech description

Classification

  • Type

    J<sub>x</sub> - Unclassified - Peer-reviewed scientific article (Jimp, Jsc and Jost)

  • CEP classification

    BC - Theory and management systems

  • OECD FORD branch

Result continuities

  • Project

    <a href="/en/project/TE01020197" target="_blank" >TE01020197: Centre for Applied Cybernetics 3</a><br>

  • Continuities

    P - Projekt vyzkumu a vyvoje financovany z verejnych zdroju (s odkazem do CEP)

Others

  • Publication year

    2014

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

Data specific for result type

  • Name of the periodical

    Applied Thermal Engineering

  • ISSN

    1359-4311

  • e-ISSN

  • Volume of the periodical

    70

  • Issue of the periodical within the volume

    2

  • Country of publishing house

    US - UNITED STATES

  • Number of pages

    12

  • Pages from-to

    1294-1305

  • UT code for WoS article

    000341556200027

  • EID of the result in the Scopus database