All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Agent-based Production Scheduling for Aircraft Manufacturing Ramp-up

The result's identifiers

  • Result code in IS VaVaI

    <a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F68407700%3A21230%2F15%3A00232391" target="_blank" >RIV/68407700:21230/15:00232391 - isvavai.cz</a>

  • Alternative codes found

    RIV/68407700:21730/15:00232391

  • Result on the web

    <a href="http://link.springer.com/chapter/10.1007/978-3-319-22867-9_13" target="_blank" >http://link.springer.com/chapter/10.1007/978-3-319-22867-9_13</a>

  • DOI - Digital Object Identifier

    <a href="http://dx.doi.org/10.1007/978-3-319-22867-9_13" target="_blank" >10.1007/978-3-319-22867-9_13</a>

Alternative languages

  • Result language

    angličtina

  • Original language name

    Agent-based Production Scheduling for Aircraft Manufacturing Ramp-up

  • Original language description

    The paper presents a solution for scheduling of the aircraft production during the ramp-up phase. The developed scheduler features a combination of multi-agent systems and classical constraint logic programming algorithms. The concept of multi-agent systems is used to break down the complexity of the scheduling problem into smaller, independent sub-problems that can be solved independently and in parallel by individual agents. The selected use case is the Airbus A350 assembly line organized as a sequence of several assembly stations. Each station?s schedule is computed by a single agent, however the coordination among agents takes place to handle situations when particular jobs cannot be finished in the original station, for instance due to missing parts, and have to be passed in the next station. The presented solution was developed within the European FP7 project ARUM.

  • Czech name

  • Czech description

Classification

  • Type

    D - Article in proceedings

  • CEP classification

    JC - Computer hardware and software

  • OECD FORD branch

Result continuities

  • Project

    <a href="/en/project/7E13001" target="_blank" >7E13001: Adaptive Production Management</a><br>

  • Continuities

    P - Projekt vyzkumu a vyvoje financovany z verejnych zdroju (s odkazem do CEP)

Others

  • Publication year

    2015

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

Data specific for result type

  • Article name in the collection

    Proceedings of the 7th International Conference on Industrial Applications of Holonic and Multi-Agent Systems (HoloMAS 2015)

  • ISBN

    978-3-319-22866-2

  • ISSN

    0302-9743

  • e-ISSN

  • Number of pages

    12

  • Pages from-to

    145-156

  • Publisher name

    Springer International Publishing

  • Place of publication

    Cham

  • Event location

    Valencia

  • Event date

    Sep 2, 2015

  • Type of event by nationality

    WRD - Celosvětová akce

  • UT code for WoS article