All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Safety Culture and Critical Infrastructure Safety

The result's identifiers

  • Result code in IS VaVaI

    <a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F68407700%3A21260%2F11%3A00190047" target="_blank" >RIV/68407700:21260/11:00190047 - isvavai.cz</a>

  • Alternative codes found

    RIV/68407700:21260/11:00190057

  • Result on the web

    <a href="http://dx.doi.org/10.1109/ICVES.2011.5983826" target="_blank" >http://dx.doi.org/10.1109/ICVES.2011.5983826</a>

  • DOI - Digital Object Identifier

    <a href="http://dx.doi.org/10.1109/ICVES.2011.5983826" target="_blank" >10.1109/ICVES.2011.5983826</a>

Alternative languages

  • Result language

    angličtina

  • Original language name

    Safety Culture and Critical Infrastructure Safety

  • Original language description

    The safety culture must be systematically built taking into account the actual piece of knowledge and experience. The safety management establishing the safety culture has three basic phases: the standard (current) management, emergency management and crisis management. With regard to a present knowledge the optimum safety of the set of infrastructures is not the set of optimum safeties of partial infrastructures but the flexible set of measures and activities respecting the dynamic behaviour of individual infrastructures and their interconnection that is based on integral risk management related to human and other public assets. The implementation of integral risk management represents new safety culture in a given territory.

  • Czech name

  • Czech description

Classification

  • Type

    D - Article in proceedings

  • CEP classification

    AQ - Safety and health protection, safety in operating machinery

  • OECD FORD branch

Result continuities

  • Project

    <a href="/en/project/7E11072" target="_blank" >7E11072: Foresight Security Scenarios: Mapping Research to a Comprehensive Approach to Exogenous EU Roles</a><br>

  • Continuities

    P - Projekt vyzkumu a vyvoje financovany z verejnych zdroju (s odkazem do CEP)

Others

  • Publication year

    2011

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

Data specific for result type

  • Article name in the collection

    ICVES 2011

  • ISBN

    978-1-4577-0577-9

  • ISSN

  • e-ISSN

  • Number of pages

    6

  • Pages from-to

    263-268

  • Publisher name

    IEEE

  • Place of publication

    Binjiang

  • Event location

    Beijing

  • Event date

    Jul 10, 2011

  • Type of event by nationality

    WRD - Celosvětová akce

  • UT code for WoS article