VEHICLE PRODUCTIVITY IN NEW OPERATED RAIL-SERVICES
The result's identifiers
Result code in IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F68407700%3A21260%2F18%3A00328531" target="_blank" >RIV/68407700:21260/18:00328531 - isvavai.cz</a>
Result on the web
—
DOI - Digital Object Identifier
—
Alternative languages
Result language
angličtina
Original language name
VEHICLE PRODUCTIVITY IN NEW OPERATED RAIL-SERVICES
Original language description
For newly introduced transport services, there´s not only the transport aspect that matters what the new service will bring to passengers, but also the operating costs are very important. In this area the systematic timetable planning plays an important role. Total costs of the transport system are significantly affected by the fixed costs, deriving from the number of regular deployed vehicles and drivers, related to the overall transport performance and total operational productivity. Advanced timetable engineering means a strong link between timetables, vehicles and infrastructure. The article demonstrates this approach on the example of the introduction of new express trains Praha - Plzeň - Cheb / München in the timetable 2017/18.
Czech name
—
Czech description
—
Classification
Type
J<sub>ost</sub> - Miscellaneous article in a specialist periodical
CEP classification
—
OECD FORD branch
20104 - Transport engineering
Result continuities
Project
—
Continuities
V - Vyzkumna aktivita podporovana z jinych verejnych zdroju
Others
Publication year
2018
Confidentiality
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Data specific for result type
Name of the periodical
international scientific journal tran&MOTAUTO WORLD
ISSN
2367-8399
e-ISSN
—
Volume of the periodical
III
Issue of the periodical within the volume
4/2018
Country of publishing house
BG - BULGARIA
Number of pages
3
Pages from-to
185-187
UT code for WoS article
—
EID of the result in the Scopus database
—