All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Railway Superstructure for High-speed Rails

The result's identifiers

  • Result code in IS VaVaI

    <a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F68407700%3A21260%2F21%3A00353880" target="_blank" >RIV/68407700:21260/21:00353880 - isvavai.cz</a>

  • Result on the web

    <a href="https://doi.org/10.14311/APP.2021.31.0053" target="_blank" >https://doi.org/10.14311/APP.2021.31.0053</a>

  • DOI - Digital Object Identifier

    <a href="http://dx.doi.org/10.14311/APP.2021.31.0053" target="_blank" >10.14311/APP.2021.31.0053</a>

Alternative languages

  • Result language

    angličtina

  • Original language name

    Railway Superstructure for High-speed Rails

  • Original language description

    The construction of the track is solved as a conventional (with track ballast) or as aballastless track (without track ballast). When deciding on the choice of the most suitable track designfor high-speed rail, it is necessary to emphasize that with increasing line speed, the requirements forthe quality of the track geometry increase, including the size of the deviations of individual geometricparameters of the track from the projected values. When assessing the choice of track structure –especially for high-speed rails – it is therefore necessary and correct to assess the total costs (investmentand operational) for a sufficiently long time. DB Netz AG’s present experience with a ballastless tracksince its first implementation in 1972 in Rheda station, for almost 50 years, shows that the requiredlifetime of 60 years has its real justification. In addition, current research and development in the fieldof ballastless track is moving towards extending the life of ballastless track well beyond this limit. Thepaper is focused on the comparison a ballasted and ballastless track construction. It deals in moredetail with evaluation of the advantages and disadvantages of a ballastless track construction. Themain objective is to assess the use of ballastless track structure for the construction of high-speed lines.

  • Czech name

  • Czech description

Classification

  • Type

    D - Article in proceedings

  • CEP classification

  • OECD FORD branch

    20104 - Transport engineering

Result continuities

  • Project

  • Continuities

    S - Specificky vyzkum na vysokych skolach

Others

  • Publication year

    2021

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

Data specific for result type

  • Article name in the collection

    IRICoN 2020: High-Speed Lines – The Future of Czech Railways

  • ISBN

    978-80-01-06865-6

  • ISSN

  • e-ISSN

    2336-5382

  • Number of pages

    5

  • Pages from-to

    53-57

  • Publisher name

    České vysoké učení technické v Praze

  • Place of publication

    Praha

  • Event location

    Praha

  • Event date

    Nov 10, 2020

  • Type of event by nationality

    CST - Celostátní akce

  • UT code for WoS article