All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

LONG TERM MEASURING OF EXPANSIONS AND CONTRACTIONS OF PRE-STRESSED CONCRETE BRIDGE STRUCTURE

The result's identifiers

  • Result code in IS VaVaI

    <a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F68407700%3A21610%2F15%3A00301732" target="_blank" >RIV/68407700:21610/15:00301732 - isvavai.cz</a>

  • Alternative codes found

    RIV/68407700:21110/15:00301732

  • Result on the web

    <a href="http://dx.doi.org/10.4028/www.scientific.net/KEM.714.201" target="_blank" >http://dx.doi.org/10.4028/www.scientific.net/KEM.714.201</a>

  • DOI - Digital Object Identifier

    <a href="http://dx.doi.org/10.4028/www.scientific.net/KEM.714.201" target="_blank" >10.4028/www.scientific.net/KEM.714.201</a>

Alternative languages

  • Result language

    angličtina

  • Original language name

    LONG TERM MEASURING OF EXPANSIONS AND CONTRACTIONS OF PRE-STRESSED CONCRETE BRIDGE STRUCTURE

  • Original language description

    The presented paper considers approx. 5 years measurement on concrete railway bridge. The span is 39.875 + 34.877 + 37.000 + 9 x 31.500 m. The total length of the bridge is 443 m. Structure possesses typical three-box cross section. Monitoring was focused on temperature of concrete, temperature of atmosphere in the shade and mainly on measurement of movements of several bearings. Because the monitoring period of bridge structure was approx. 5 year, the probability p = 0.2 (5 years returning period) was chosen in order to compare measured data with standard values according to EN 1991-1-5. Of course, the standard value was assumed without any safety factor for this purpose. The maximal difference of measured and standard values was only 25 mm. This was achieved on the pillar where measured value of displacement range was 135 mm, standard value 160 mm and the dilatation length was 332 m. On the other hand, the minimal difference was only 3 mm on the pillar where measured value was 33 mm, standard value 36 mm and the dilatation length was 75 m. If the approx. 5 years measurement is compared with theoretical value of 5 years return period, the standard procedure cannot be classified as very conservative. It was shown that the long-time measurement is very important for the further development and improvement of the Eurocodes as well as statistical approach, i.e., returning time which shall be taken into account.

  • Czech name

  • Czech description

Classification

  • Type

    D - Article in proceedings

  • CEP classification

    JM - Structural engineering

  • OECD FORD branch

Result continuities

  • Project

    <a href="/en/project/GBP105%2F12%2FG059" target="_blank" >GBP105/12/G059: Cumulative time dependent processes in building materials and structures</a><br>

  • Continuities

    P - Projekt vyzkumu a vyvoje financovany z verejnych zdroju (s odkazem do CEP)

Others

  • Publication year

    2015

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

Data specific for result type

  • Article name in the collection

    Proceedings of the 17th Conference on the Rehabilitation and Reconstruction of Buildings (CRRB 2015)

  • ISBN

    978-3-03835-719-3

  • ISSN

    1013-9826

  • e-ISSN

  • Number of pages

    6

  • Pages from-to

    201-206

  • Publisher name

    Trans Tech Publications

  • Place of publication

    Zurich

  • Event location

    Praha

  • Event date

    Nov 12, 2015

  • Type of event by nationality

    WRD - Celosvětová akce

  • UT code for WoS article