Potential for improving the efficiency of the design and preproduction processes of prefab timber buildings by digitization
The result's identifiers
Result code in IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F68407700%3A21720%2F23%3A00371525" target="_blank" >RIV/68407700:21720/23:00371525 - isvavai.cz</a>
Result on the web
—
DOI - Digital Object Identifier
—
Alternative languages
Result language
angličtina
Original language name
Potential for improving the efficiency of the design and preproduction processes of prefab timber buildings by digitization
Original language description
The paper presents the interim outputs of a project that deals with the digitalization of the design, pre-production, and production processes of a company that supplies more than four hundred prefabricated timber houses per year. The research aimed to analyse the current business processes, from communication with the client to the production and delivery of the turnkey house, make recommendations for maximizing the digitization of these processes, design a software solution, and prepare digital models and techniques to work with them. This paper will present the part that deals with optimizing pre-production processes. All the processes were analyzed, including communication with the client, setting up the client configurations, creating construction documentation for a building permit, creating production documentation, and transferring data for production machines to a production facility. It was then proposed to convert this workflow into a digital form, which initially uses BIM (software Archicad) to communicate with the client and produce documents for a building permit. A new process was proposed to convert the model into SEMA software and create documentation for the production machines. Finally, a comparison was made of the efficiency of this process against the original company process.
Czech name
—
Czech description
—
Classification
Type
D - Article in proceedings
CEP classification
—
OECD FORD branch
20204 - Robotics and automatic control
Result continuities
Project
<a href="/en/project/FW03010555" target="_blank" >FW03010555: Digitation and automation of production processes of prefabricated energy efficient timber buildings</a><br>
Continuities
P - Projekt vyzkumu a vyvoje financovany z verejnych zdroju (s odkazem do CEP)
Others
Publication year
2023
Confidentiality
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Data specific for result type
Article name in the collection
CEES 2023 - International Conference on Construction, Energy, Environment and Sustainability.
ISBN
978-989-54499-3-4
ISSN
—
e-ISSN
—
Number of pages
2
Pages from-to
—
Publisher name
ITeCons - Institute for Research and Technological Dev. in Construction Sciences
Place of publication
Coimbra
Event location
Funchal
Event date
Jun 27, 2023
Type of event by nationality
WRD - Celosvětová akce
UT code for WoS article
—