A matheuristic approach for an integrated lot-sizing and scheduling problem with a period-based learning effect
The result's identifiers
Result code in IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F68407700%3A21730%2F25%3A00379539" target="_blank" >RIV/68407700:21730/25:00379539 - isvavai.cz</a>
Result on the web
<a href="https://doi.org/10.1016/j.eswa.2024.126234" target="_blank" >https://doi.org/10.1016/j.eswa.2024.126234</a>
DOI - Digital Object Identifier
<a href="http://dx.doi.org/10.1016/j.eswa.2024.126234" target="_blank" >10.1016/j.eswa.2024.126234</a>
Alternative languages
Result language
angličtina
Original language name
A matheuristic approach for an integrated lot-sizing and scheduling problem with a period-based learning effect
Original language description
This research investigates a multi-product capacitated lot-sizing and scheduling problem incorporating a novel learning effect, namely the period-based learning effect. This is inspired by a real case in a core analysis laboratory under a job shop setting. Accordingly, a Mixed-Integer Linear Programming (MILP) model is extended based on the big-bucket formulation, optimizing the total tardiness and overtime costs. Given the complexity of the problem, a cutting plane method is employed to simplify the model. Afterward, three matheuristic methods based on the rolling horizon approach are devised, incorporating two lower bounds and a local search heuristic. Furthermore, a post-processing approach is implemented to incorporate lot-streaming possibility. Computational experiments demonstrate: 1) the simplified model performs effectively in terms of both solution quality and computational time; and 2) although the model encounters challenges with large-scale instances, the proposed matheuristic methods achieve satisfactory outcomes; and 3) it can be inferred that the complexity of the models and solution methods are independent of the learning effect; however, the value of learning effect may impact the performance of the lower bounds; 4) in manufacturing settings, where the lot-streaming is possible, incorporating post-processing can drastically improve the objective function; 5) the impact of the period-based learning effect in the results is significant, and the model’s sensitivity to time-based parameters (e.g., learning rate) is more than cost-based ones (e.g., tardiness cost).
Czech name
—
Czech description
—
Classification
Type
J<sub>imp</sub> - Article in a specialist periodical, which is included in the Web of Science database
CEP classification
—
OECD FORD branch
10201 - Computer sciences, information science, bioinformathics (hardware development to be 2.2, social aspect to be 5.8)
Result continuities
Project
Result was created during the realization of more than one project. More information in the Projects tab.
Continuities
P - Projekt vyzkumu a vyvoje financovany z verejnych zdroju (s odkazem do CEP)
Others
Publication year
2025
Confidentiality
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Data specific for result type
Name of the periodical
Expert Systems with Applications
ISSN
0957-4174
e-ISSN
1873-6793
Volume of the periodical
269
Issue of the periodical within the volume
4
Country of publishing house
NL - THE KINGDOM OF THE NETHERLANDS
Number of pages
13
Pages from-to
"-"-"-"
UT code for WoS article
001414274200001
EID of the result in the Scopus database
2-s2.0-85214422889