Lean production systems
The result's identifiers
Result code in IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F70883521%3A28120%2F11%3A43865650" target="_blank" >RIV/70883521:28120/11:43865650 - isvavai.cz</a>
Result on the web
—
DOI - Digital Object Identifier
—
Alternative languages
Result language
angličtina
Original language name
Lean production systems
Original language description
The article is dedicated to the Lean production systems, exactly, creating and building a manufacturing system. The production system can be understood as a set of methods and tools that lead to achievement of business strategy. In many cases the production system is incorrectly associated only with the production. We think that lean production system cannot be built only on Lean production, it is necessary to focus also on optimizing logistics, development and administrative processes. Only the correctsynchronization of these processes provides an efficiently functioning production system. And these various methods and tools especially from the modern industrial engineering and their appropriate use is the most important part of this article. The aimof the article is fully define the requirements for modern Lean production systems, outline the different steps of the building the systems and finally to share the experience of the real environment of Czech enterprises.
Czech name
—
Czech description
—
Classification
Type
O - Miscellaneous
CEP classification
AE - Management, administration and clerical work
OECD FORD branch
—
Result continuities
Project
—
Continuities
S - Specificky vyzkum na vysokych skolach
Others
Publication year
2011
Confidentiality
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů