All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Simulation Analysis of the Complex Production System with Interoperation Buffer Stores

The result's identifiers

  • Result code in IS VaVaI

    <a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F70883521%3A28140%2F13%3A43869795" target="_blank" >RIV/70883521:28140/13:43869795 - isvavai.cz</a>

  • Result on the web

    <a href="http://dx.doi.org/10.1007/978-3-319-00542-3_42" target="_blank" >http://dx.doi.org/10.1007/978-3-319-00542-3_42</a>

  • DOI - Digital Object Identifier

    <a href="http://dx.doi.org/10.1007/978-3-319-00542-3_42" target="_blank" >10.1007/978-3-319-00542-3_42</a>

Alternative languages

  • Result language

    angličtina

  • Original language name

    Simulation Analysis of the Complex Production System with Interoperation Buffer Stores

  • Original language description

    The article highlights the problem of mathematical modelling and subsequent simulation of the highly complex synthetic environment illustrating the real production system consisting of parallel manufacturing plants equipped with interoperation buffer stores. The system can be arranged optionally by means of the simulator which was created on the basis of the presented assumptions in the C# programming language. The discussed system realizes orders set by defined customers. Production control is based onheuristic algorithms which choose an order to be realized and a manufacturing plant in which the production process is carried out. The criterion is to minimize the total time of realizing orders however, as seen in the case study, also either the remaining capacity of tools after realizing all orders or the total tool replacement time can be taken into account while dealing with the problem. The modelling and projecting stages are followed by the simulation study. This simulation study

  • Czech name

  • Czech description

Classification

  • Type

    D - Article in proceedings

  • CEP classification

    JD - Use of computers, robotics and its application

  • OECD FORD branch

Result continuities

  • Project

    <a href="/en/project/ED2.1.00%2F03.0089" target="_blank" >ED2.1.00/03.0089: The Centre of Security, Information and Advanced Technologies (CEBIA-Tech)</a><br>

  • Continuities

    P - Projekt vyzkumu a vyvoje financovany z verejnych zdroju (s odkazem do CEP)

Others

  • Publication year

    2013

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

Data specific for result type

  • Article name in the collection

    Nostradamus 2013: Prediction, Modeling and Analysis of Complex Systems

  • ISBN

    978-3-319-00541-6

  • ISSN

    2194-5357

  • e-ISSN

  • Number of pages

    12

  • Pages from-to

    423-434

  • Publisher name

    Springer-Verlag Berlin

  • Place of publication

    Heidelberg

  • Event location

    Ostrava

  • Event date

    Jun 3, 2013

  • Type of event by nationality

    WRD - Celosvětová akce

  • UT code for WoS article