Parametric software effort estimation based on optimizing correction factors and multiple linear regression
The result's identifiers
Result code in IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F70883521%3A28140%2F21%3A63537858" target="_blank" >RIV/70883521:28140/21:63537858 - isvavai.cz</a>
Result on the web
<a href="https://ieeexplore.ieee.org/document/9664538" target="_blank" >https://ieeexplore.ieee.org/document/9664538</a>
DOI - Digital Object Identifier
<a href="http://dx.doi.org/10.1109/ACCESS.2021.3139183" target="_blank" >10.1109/ACCESS.2021.3139183</a>
Alternative languages
Result language
angličtina
Original language name
Parametric software effort estimation based on optimizing correction factors and multiple linear regression
Original language description
Context: Effort estimation is one of the essential phases that must be accurately predicted in the early stage of software project development. Currently, solving problems that affect the estimation accuracy of Use Case Points-based methods is still a challenge to be addressed. Objective: This paper proposes a parametric software effort estimation model based on Optimizing Correction Factors and Multiple Regression Models to minimize the estimation error and the influence of unsystematic noise, which has not been considered in previous studies. The proposed method takes advantage of the Least Squared Regression models and Multiple Linear Regression models on the Use Case Points-based elements. Method: We have conducted experimental research to evaluate the estimation accuracy of the proposed method and compare it with three previous related methods, i.e., 1) the baseline estimation method – Use Case Points, 2) Optimizing Correction Factors, and 3) Algorithmic Optimization Method. Experiments were performed on datasets (Dataset D1, Dataset D2, and Dataset D3). The estimation accuracy of the methods was analysed by applying various unbiased evaluation criteria and statistical tests. Results: The results proved that the proposed method outperformed the other methods in improving estimation accuracy. Statistically, the results proved to be significantly superior to the three compared methods based on all tested datasets. Conclusion: Based on our obtained results, the proposed method has a high estimation capability and is considered a helpful method for project managers during the estimation phase. The correction factors are considered in the estimation process. Author
Czech name
—
Czech description
—
Classification
Type
J<sub>imp</sub> - Article in a specialist periodical, which is included in the Web of Science database
CEP classification
—
OECD FORD branch
10201 - Computer sciences, information science, bioinformathics (hardware development to be 2.2, social aspect to be 5.8)
Result continuities
Project
—
Continuities
I - Institucionalni podpora na dlouhodoby koncepcni rozvoj vyzkumne organizace
Others
Publication year
2021
Confidentiality
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Data specific for result type
Name of the periodical
IEEE Access
ISSN
2169-3536
e-ISSN
—
Volume of the periodical
10
Issue of the periodical within the volume
Neuveden
Country of publishing house
US - UNITED STATES
Number of pages
24
Pages from-to
2963-2986
UT code for WoS article
000741990600001
EID of the result in the Scopus database
2-s2.0-85122291307