All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Parametric software effort estimation based on optimizing correction factors and multiple linear regression

The result's identifiers

  • Result code in IS VaVaI

    <a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F70883521%3A28140%2F21%3A63537858" target="_blank" >RIV/70883521:28140/21:63537858 - isvavai.cz</a>

  • Result on the web

    <a href="https://ieeexplore.ieee.org/document/9664538" target="_blank" >https://ieeexplore.ieee.org/document/9664538</a>

  • DOI - Digital Object Identifier

    <a href="http://dx.doi.org/10.1109/ACCESS.2021.3139183" target="_blank" >10.1109/ACCESS.2021.3139183</a>

Alternative languages

  • Result language

    angličtina

  • Original language name

    Parametric software effort estimation based on optimizing correction factors and multiple linear regression

  • Original language description

    Context: Effort estimation is one of the essential phases that must be accurately predicted in the early stage of software project development. Currently, solving problems that affect the estimation accuracy of Use Case Points-based methods is still a challenge to be addressed. Objective: This paper proposes a parametric software effort estimation model based on Optimizing Correction Factors and Multiple Regression Models to minimize the estimation error and the influence of unsystematic noise, which has not been considered in previous studies. The proposed method takes advantage of the Least Squared Regression models and Multiple Linear Regression models on the Use Case Points-based elements. Method: We have conducted experimental research to evaluate the estimation accuracy of the proposed method and compare it with three previous related methods, i.e., 1) the baseline estimation method – Use Case Points, 2) Optimizing Correction Factors, and 3) Algorithmic Optimization Method. Experiments were performed on datasets (Dataset D1, Dataset D2, and Dataset D3). The estimation accuracy of the methods was analysed by applying various unbiased evaluation criteria and statistical tests. Results: The results proved that the proposed method outperformed the other methods in improving estimation accuracy. Statistically, the results proved to be significantly superior to the three compared methods based on all tested datasets. Conclusion: Based on our obtained results, the proposed method has a high estimation capability and is considered a helpful method for project managers during the estimation phase. The correction factors are considered in the estimation process. Author

  • Czech name

  • Czech description

Classification

  • Type

    J<sub>imp</sub> - Article in a specialist periodical, which is included in the Web of Science database

  • CEP classification

  • OECD FORD branch

    10201 - Computer sciences, information science, bioinformathics (hardware development to be 2.2, social aspect to be 5.8)

Result continuities

  • Project

  • Continuities

    I - Institucionalni podpora na dlouhodoby koncepcni rozvoj vyzkumne organizace

Others

  • Publication year

    2021

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

Data specific for result type

  • Name of the periodical

    IEEE Access

  • ISSN

    2169-3536

  • e-ISSN

  • Volume of the periodical

    10

  • Issue of the periodical within the volume

    Neuveden

  • Country of publishing house

    US - UNITED STATES

  • Number of pages

    24

  • Pages from-to

    2963-2986

  • UT code for WoS article

    000741990600001

  • EID of the result in the Scopus database

    2-s2.0-85122291307