All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

THE RISK MANAGEMENT IN THE SELECTED COMPANY

The result's identifiers

  • Result code in IS VaVaI

    <a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F70883521%3A28160%2F19%3A63523681" target="_blank" >RIV/70883521:28160/19:63523681 - isvavai.cz</a>

  • Result on the web

  • DOI - Digital Object Identifier

Alternative languages

  • Result language

    angličtina

  • Original language name

    THE RISK MANAGEMENT IN THE SELECTED COMPANY

  • Original language description

    The paper deals with risk management in the organization SFINX in the Czech Republic. Firstly, there is a literature review of risk management. Secondly, there is a used methodology part. In this part is discussed SWOT analysis and risk matrix with a modified score method. In the questionnaire, the risks were divided into A) Production risks (technical, social, purchasing, distribution), B) Economic risks, C) Market risks, D) Financial risks, E) Political risks. The probability of the occurrence of the risk was assessed: value one for the lowest occurrence, while value five for the highest, the most probable occurrence. The impact was assessed similar: number one for the least serious impact, while number five for the most severe effect. Based on the questionnaire were evaluated the most critical risks that threaten the organization from the perspective of employees. The resulting risk is determined by the product of the probability and impact of the risk. In this paper, risk was determined by multiplying the average values of probability and impact of the selected risk. The averages of these two quantities were obtained based on a questionnaire survey. Then the selected risks were entered on the map, for the risks placed in the significant risk values quadrant and the critical risk values quadrant, the scoring method recommends making proposals to reduce them. In this work, the technique will be adjusted so that the probability and impact will be evaluated from 1 to 5. In the end of the paper, there are presented the results based on the mentioned methodology – the most severe risks that may threaten the organization. Finally, there is recommendations for the organization.

  • Czech name

  • Czech description

Classification

  • Type

    D - Article in proceedings

  • CEP classification

  • OECD FORD branch

    20101 - Civil engineering

Result continuities

  • Project

  • Continuities

    V - Vyzkumna aktivita podporovana z jinych verejnych zdroju

Others

  • Publication year

    2019

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

Data specific for result type

  • Article name in the collection

    DOKBAT 2019 - 15th International Bata Conference for Ph.D. Students and Young Researchers

  • ISBN

    978-80-7454-893-2

  • ISSN

  • e-ISSN

  • Number of pages

    6

  • Pages from-to

    885-890

  • Publisher name

    Fakulta managementu a ekonomiky, UTB ve Zlíně

  • Place of publication

    Zlín

  • Event location

    Zlín

  • Event date

    Nov 6, 2019

  • Type of event by nationality

    EUR - Evropská akce

  • UT code for WoS article