All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Proposal for the flow of material and adjustments to the storage system of an external service provider

The result's identifiers

  • Result code in IS VaVaI

    <a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F70883521%3A28160%2F21%3A63532318" target="_blank" >RIV/70883521:28160/21:63532318 - isvavai.cz</a>

  • Result on the web

    <a href="https://www.degruyter.com/document/doi/10.1515/eng-2021-0098/html" target="_blank" >https://www.degruyter.com/document/doi/10.1515/eng-2021-0098/html</a>

  • DOI - Digital Object Identifier

    <a href="http://dx.doi.org/10.1515/eng-2021-0098" target="_blank" >10.1515/eng-2021-0098</a>

Alternative languages

  • Result language

    angličtina

  • Original language name

    Proposal for the flow of material and adjustments to the storage system of an external service provider

  • Original language description

    This article deals with issues related to the flow of material to the assembly line and examines the possibilities of reducing the costs of this process. It is based on the current state of the transport of individual parts to the producing company and the storage system using Kanban and Just in Sequence (JIS) logistics technologies, and the subsequent collection of material for transport to the assembly line. The change in the system of transport technology has led to a reduction of the total storage space and costs, and at the same time, the processes related to storage and collection of parts have been simplified. The whole process of material flow to the assembly line is solved using the real supply system via the JIS technology, together with the system of receipt and storage of components in connection with individual operations during the handling and storage of these components, and their picking and transport to the assembly line. Evidently, the change in the system and the associated savings can also be employed to warehouses and manufacturing companies of the automotive industry, which use automated assembly lines with the timing of the assembly process of the final product.

  • Czech name

  • Czech description

Classification

  • Type

    J<sub>imp</sub> - Article in a specialist periodical, which is included in the Web of Science database

  • CEP classification

  • OECD FORD branch

    20104 - Transport engineering

Result continuities

  • Project

    <a href="/en/project/VI04000080" target="_blank" >VI04000080: Crisis Logistics Information Platform</a><br>

  • Continuities

    P - Projekt vyzkumu a vyvoje financovany z verejnych zdroju (s odkazem do CEP)

Others

  • Publication year

    2021

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

Data specific for result type

  • Name of the periodical

    Open Engineering

  • ISSN

    2391-5439

  • e-ISSN

  • Volume of the periodical

    11

  • Issue of the periodical within the volume

    1

  • Country of publishing house

    PL - POLAND

  • Number of pages

    8

  • Pages from-to

    948-955

  • UT code for WoS article

    000704518400001

  • EID of the result in the Scopus database

    2-s2.0-85117948512