Beginning of Real Wide us of BIM Technology in Czech Republic
The result's identifiers
Result code in IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F75081431%3A_____%2F19%3A00001418" target="_blank" >RIV/75081431:_____/19:00001418 - isvavai.cz</a>
Result on the web
<a href="http://dx.doi.org/10.1088/1757-899X/471/10/102010" target="_blank" >http://dx.doi.org/10.1088/1757-899X/471/10/102010</a>
DOI - Digital Object Identifier
<a href="http://dx.doi.org/10.1088/1757-899X/471/10/102010" target="_blank" >10.1088/1757-899X/471/10/102010</a>
Alternative languages
Result language
angličtina
Original language name
Beginning of Real Wide us of BIM Technology in Czech Republic
Original language description
As in all aspects of our lives, development and innovative solutions reveal every day. Life without progressive things, such as a mobile phone or the Internet, is unimaginable for man living in our modern age. Towards the current trend called Industry 4.0., which is the trend of data exchange and automation in manufacturing technologies, people are on the brink of big changes. Current digitization in our everyday lives helps us to enhance their quality. As many other branches, AEC (architecture, engineering and construction) industry also goes through the enhanced digitization process. As an effective tool following trend Industry 4.0 in AEC industry, BIM - Building Information Modelling (or Management) Technology has proven itself. Nowadays, in many not even European Countries, the BIM Technology is in different levels of using. Connected to it, BIM is on different phases of implementation into legislation these days. In some countries, using BIM Technology for new building design is compulsory for public service contracts, building infrastructures or for all building without the difference. In order to be competitive, in the Czech Republic's Legislation, the trend is the same. But there are many barriers for BIM implementation, or the BIM adoption. Proper solutions for many key topics is necessary to find before the introduction of BIM for widespread use. Of course, finding these solutions take a lot of time, expenditures and failures to reveal the most optimal solution of implementation. The Czech Republic is one of countries which already started with processes connected to BIM implementation and adoption. At these days, country is solving many issues connected to BIM implementation. This paper is a brief presentation of them and it reveals the reasons and ways to achieve this.
Czech name
—
Czech description
—
Classification
Type
D - Article in proceedings
CEP classification
—
OECD FORD branch
20101 - Civil engineering
Result continuities
Project
—
Continuities
N - Vyzkumna aktivita podporovana z neverejnych zdroju
Others
Publication year
2019
Confidentiality
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Data specific for result type
Article name in the collection
3rd World Multidisciplinary Civil Engineering, Architecture, Urban Planning Symposium, WMCAUS 2018, Conference proceedings in IOP Conference Series: Materials Science and Engineering, Volume 471, Issue 10
ISBN
—
ISSN
1757-8981
e-ISSN
—
Number of pages
7
Pages from-to
—
Publisher name
Institute of Physics Publishing
Place of publication
Neuveden
Event location
Prague
Event date
Jun 18, 2018
Type of event by nationality
WRD - Celosvětová akce
UT code for WoS article
—