All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Dynamical Model for Calculation Transverse Forces between Overhead Bridge Crane and Crane Runway

The result's identifiers

  • Result code in IS VaVaI

    <a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F75081431%3A_____%2F20%3A00001715" target="_blank" >RIV/75081431:_____/20:00001715 - isvavai.cz</a>

  • Result on the web

    <a href="http://dx.doi.org/10.1088/1757-899X/728/1/012001" target="_blank" >http://dx.doi.org/10.1088/1757-899X/728/1/012001</a>

  • DOI - Digital Object Identifier

    <a href="http://dx.doi.org/10.1088/1757-899X/728/1/012001" target="_blank" >10.1088/1757-899X/728/1/012001</a>

Alternative languages

  • Result language

    angličtina

  • Original language name

    Dynamical Model for Calculation Transverse Forces between Overhead Bridge Crane and Crane Runway

  • Original language description

    Abstract. Horizontal forces between the crane and the crane runway girder occur during a motion of an overhead travelling crane on the crane runway. There are several methods for calculation of these forces. The most significant load caused by motion of crane is the skewing and the acceleration of the crane and of the crab. This paper deals with the acceleration of the crane and with the skewing of the crane. In present the skewing of crane is defined as the motion of the overhead bridge crane with the constant velocity but with the angle relative to the crane runway. The transverse forces caused by acceleration of the crane are calculated separately. But the skewing of the crane can occur also during the accelerating of the crane. Present standards don’t take this situation into account. A dynamical model presented in this paper describes motion of the overhead double bridge crane during its acceleration. The basic assumption of this model is that there the contact between the rim of the firs crane wheel and the rail of the crane runway.

  • Czech name

  • Czech description

Classification

  • Type

    D - Article in proceedings

  • CEP classification

  • OECD FORD branch

    20101 - Civil engineering

Result continuities

  • Project

  • Continuities

    V - Vyzkumna aktivita podporovana z jinych verejnych zdroju

Others

  • Publication year

    2020

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

Data specific for result type

  • Article name in the collection

    IOP Conference Series: Materials Science and Engineering, (11th International Conference Building Defects 2019)

  • ISBN

  • ISSN

    1757-8981

  • e-ISSN

  • Number of pages

    6

  • Pages from-to

  • Publisher name

    Institute of Physics Publishing

  • Place of publication

    Spojené království

  • Event location

    České Budějovice

  • Event date

    Nov 28, 2019

  • Type of event by nationality

    WRD - Celosvětová akce

  • UT code for WoS article