All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Filters

10 527 (0,122s)

Result

Sliding Mode Control of Time Delay Systems with Anti Wind-Up

BC - Teorie a systémy řízení

  • 2001
  • D
Result

Simulation of Wind Power Plant with Constant Speed

JE - Nejaderná energetika, spotřeba a užití energie

  • 2012
  • D
Result

Saturation in Engineering Simulation

JB - Senzory, čidla, měření a regulace

  • 2013
  • D
  • Link
Result

Dlouhodobá pozitivita anti Hu protilátek u neurologického syndromu bez průkazu tumoru

FH - Neurologie, neurochirurgie, neurovědy

  • 2006
  • D
Result

Experimental set-up for advanced aeroelastic tests on sectional models

JM - Inženýrské stavitelství

  • 2016
  • Jx
  • Link
Result

Multipurpose experimental rig for aeroelastic tests of bridge girders and slender beams

JM - Inženýrské stavitelství

  • 2011
  • D
Result

THE INFLUENCE OF CURRENT ON THE HEIGHT OF WIND WAVE RUN-UP. A comparison of experimental results with the Czech National Standard

Civil engineering

  • 2012
  • JSC
  • Link
Result

Growing up Under Lindberg's Presidency: Philip Roth's The Plot Against America as Alternate History

AJ - Písemnictví, mas–media, audiovize

  • 2011
  • C
Result

Nivolumab versus Everolimus in Advanced Renal-Cell Carcinoma

FD - Onkologie a hematologie

  • 2015
  • Jx
  • Link
Result

Retinal oximetry does not predict 12-month visual outcome after anti-VEGF treatment for central retinal vein occlusion: A multicentre study

Ophthalmology

  • 2021
  • Jimp
  • Link
  • 1 - 10 out of 10 527