All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Filters

187 (0,076s)

Result

Contamined Runway Operations

Guidance for operations on contaminated runways requires continual improvement. The aim of this article is to provide such clarity and direction, keeping in mind that contaminated runway operations still requires judgment and decisi...

JU - Aeronautika, aerodynamika, letadla

  • 2013
  • Jx
  • Link
Result

Application of Altered Methodology for Bearing Strength Measurements of Unpaved Airport Surfaces

This paper deals with measurements of bearing strength resistance of both grassy runways and transition surfaces of paved runways such as runway end safety areas and runway strips in the environment of the Czech Ai...

Mechanical engineering

  • 2018
  • D
  • Link
Result

Loading of the Crane Runway Caused by Skewing of the Bridže Crane

Horizontal loads between the crane and the runway girder occur during a motion of an overhead travelling crane on the crane runway. There are several procedures for determination of these horizontal loads varying both in physical mo...

JN - Stavebnictví

  • 2005
  • Jx
Result

LED Runway edge light

Functional model is a modern runway edge light which uses microprocessor control and possibility of the local or remote control. The light can be a part of the runway edge light system at the normal or operational airport....

KA - Vojenství

  • 2012
  • Gfunk
  • Link
Result

Quality requirements for welding crane steel structures and crane runways

Requirements standard EN 729 for welding crane runways.

JR - Ostatní strojírenství

  • 1999
  • D
Result

Runway Safety Areas

This article is focused on areas around runway and their dimensions for safety reason of air accidents and incidents.There is proposed new calculation of these dimensions....

JU - Aeronautika, aerodynamika, letadla

  • 2015
  • Jx
  • Link
Result

Parallel Runway 06R/24L- Prague-Ruzyně Airport

The article is focused on the capacity-increase of Prague-Ruzyně Airport, preparation of building-up of Parallel Runway 06R/24L and all the building plans. It informs about geometric chararcteristics and assumed runway equipment....

JN - Stavebnictví

  • 2006
  • D
Result

*Static analysis of crane runway exposed to various versions of actions

*The report is containing results of static survey and static analyses of the crane runways of hall od MONDI Štětí, a.s.

JN - Stavebnictví

  • 2015
  • Vsouhrn
Result

Determination Basic Parameters of Parallel Runway 06R/24L and Related Movemet Areas - Prague Ruzyně Airport

The article is focused on the capacity - increase of Prague-Ruzyně airport, preparation of building - up of Parallel Runway 06R/24L and all the building plans. It informs about geometric characteristics and assumed runway equipment....

JN - Stavebnictví

  • 2007
  • D
Result

Twenty-four kilometers to the future: electrified runway Tábor-Bechyně of 1903

Contribution deals with the first electrified runway Tabor Bechyne-built in 1903 in the Austro-Hungarian Empire in the Czech lands by František Křižík. Article describes professional advancement Czech engineers in solving this electrified

AB - Dějiny

  • 2011
  • Jx
  • 1 - 10 out of 187