Filters
The flood in June 2013 on the dam Hostivař
The article presents the results of the evaluation during the floods in June 2013 in the watershed and how to handle Botiče on the dam Hostivař. It concludes with some recommendations for the future operation of the work....
JN - Stavebnictví
- 2014 •
- D •
- Link
Rok uplatnění
D - Stať ve sborníku
Výsledek na webu
Hostivař Dam - accumulation of priority pollutants in sediments between 1964-2010
The aim of this paper is to present the primary results from unique collection of the sediment from Hostivař reservoir (Prague, the Czech Republic). Sampling was performed by a core sampler. Collected samples have documented history of the p...
JN - Stavebnictví
- 2013 •
- D
Rok uplatnění
D - Stať ve sborníku
Physical hydraulic research of the spillway of the Hostivař dam
The aim of the research is to assess the new spillway on the Hostivař dam on the physical model. The new spillway is designed as a side spillway with 63 m length of the weir on the right bank of the dam. The flow over the n...
Construction engineering, Municipal and structural engineering
- 2019 •
- Vsouhrn •
- Link
Rok uplatnění
Vsouhrn - Souhrnná výzkumná zpráva
Výsledek na webu
The conflicts in flood routing through the recreational reservoir Hostivař in Prague
The main purpose of the Hostivař dam in prague is recreation when the reservoir years several facilities downstream of the dam were flooded byrelatively rapid increase of water level in the Botič stream downstream of the
Civil engineering
- 2015 •
- D
Rok uplatnění
D - Stať ve sborníku
Hydraulic model of the spillway of the Hostivař dam
The hydraulic model is a functional sample of the proposed spillway of the Hostivař dam. The functional sample contains parts of the reservoir, tailrace tunnel from the existing spillway, existing stilling basin, new spillway and ch...
Civil engineering
- 2018 •
- Gfunk
Rok uplatnění
Gfunk - Funkční vzorek
40 Years accumulation of pollution in Hostivař reservoir sediment
The aim of this paper to present the primary result from unique collection of the Hostivař reservoir (Prague, the Czech Republic) sediment. Sampling was performed fillingthe dam in 1964 to the present (2011). The result showed long-...
DJ - Znečištění a kontrola vody
- 2011 •
- D
Rok uplatnění
D - Stať ve sborníku
Assessment of the function VD Hostivař during flood in 2013
The aim of the study is to assess the causes and course of the flood event in the catchment of the reservoir Hostivař in June 2013. The study includes verification of capacity of functional objects using hydraulic calculations, derivation of...
JM - Inženýrské stavitelství
- 2013 •
- Vsouhrn
Rok uplatnění
Vsouhrn - Souhrnná výzkumná zpráva
Trends of historical pollution in sediments from Hostivař dam from years 1964-2010
The paper presents basic results obtained from a unique collection of sediment core sampler from draining Hostivař dam. The samples document history of pollution from its filling in 1964 to the present (2010 ). The results showed in...
DJ - Znečištění a kontrola vody
- 2013 •
- D
Rok uplatnění
D - Stať ve sborníku
Hostivař reservoir - changes in Botič catchment and floods
Hostivař reservoir is situated on the creek Botič and is a dominant of the southern edge of Prague. Hostivař resevoir was built between years 1959 and 1963 under will be animportant stream in Prague, its catchment area with the clos...
AL - Umění, architektura, kulturní dědictví
- 2013 •
- D
Rok uplatnění
D - Stať ve sborníku
Priority pollutants in sediment from Hostivař reservoir - 40 years of accumulation
of the Hostivař reservoir (Prague, the Czech Republic) sediment. Sampling was performed filling the dam in 1964 to present (2011). The results showed increased amounts of most metals and PAHs in the deepest sediments originating fr...
DJ - Znečištění a kontrola vody
- 2012 •
- D
Rok uplatnění
D - Stať ve sborníku
- 1 - 10 out of 2 513