Filters
Hot-water boiler Viadrus U26B-FV
It was developed hot-water boiler for combustion of solid fuels. Boiler works on the principle of over-fire combustion. Boiler has optimized hot-water heat exchanger for boiler e...
JE - Nejaderná energetika, spotřeba a užití energie
- 2012 •
- Gfunk
Rok uplatnění
Gfunk - Funkční vzorek
Hot-water boiler H412 EKO-FV
Under-fire hot-water boiler fired by biomass and coal (with grate).
JE - Nejaderná energetika, spotřeba a užití energie
- 2011 •
- Gfunk
Rok uplatnění
Gfunk - Funkční vzorek
Hot-water boiler H450 EKO-FV
Under-fire hot-water boiler fired by biomass and coal (with grate).
JE - Nejaderná energetika, spotřeba a užití energie
- 2011 •
- Gfunk
Rok uplatnění
Gfunk - Funkční vzorek
Hot-water boiler H418 EKO-FV
Hot-water boiler fired by solid fuels with under-fire princip of fuel combustion.
JE - Nejaderná energetika, spotřeba a užití energie
- 2011 •
- Gfunk
Rok uplatnění
Gfunk - Funkční vzorek
Hot-water boiler Benekov C100-FV
It was developed an automatic hot-water boiler Benekov C100-FV. As a fuel it can be used coal and pellets. Boiler is equipped with modern control unit....
JE - Nejaderná energetika, spotřeba a užití energie
- 2011 •
- Gfunk
Rok uplatnění
Gfunk - Funkční vzorek
Hot-water boiler Viadrus U26 plus
It was developed a hot-water boiler burning wood. The boiler is working on a "gasification" principle.
JE - Nejaderná energetika, spotřeba a užití energie
- 2010 •
- Gfunk
Rok uplatnění
Gfunk - Funkční vzorek
Hot-water boiler Benekov R8
It was developed an hot-water boiler Benekov R8 for heating the low-energy houses. It is equiped with rotating burner. Recommended fuel is pellets....
JE - Nejaderná energetika, spotřeba a užití energie
- 2011 •
- Gfunk
Rok uplatnění
Gfunk - Funkční vzorek
Performing GM 2 hot water boilers HWB and performing GM waste heat boiler HRHWB in the heating plant in Oradea, Romania.
Performing gaurantee measuring of 2 hot water boilers and performing guarantee measuring of waste heat boiler in the heating plant Oradea in Romania....
JE - Nejaderná energetika, spotřeba a užití energie
- 2016 •
- Vsouhrn
Rok uplatnění
Vsouhrn - Souhrnná výzkumná zpráva
Prototype of hot water boiler with maximal output 5,25 MW
The 5.25 MW prototype is intended for design verification and functional testing of a hot water boiler. The design of the boiler is carried out with a view to increasing the service life and improving the flue gas ...
Mechanical engineering
- 2021 •
- Gprot
Rok uplatnění
Gprot - Prototyp
Hot-water boiler Benekov C25p-P
It as developed a hot-water boiler burning wood pelets. Boiler is equipped with patented burner. Boiler has modern control unit. Due to high efficiency the boiler has low consumption of fuel....
JE - Nejaderná energetika, spotřeba a užití energie
- 2010 •
- Gprot
Rok uplatnění
Gprot - Prototyp
- 1 - 10 out of 72 258