All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Filters

302 (0,148s)

Result

The dike of water reservoir monitoring by EIS method

Results of the dike of water reservoir monitoring by EIS method are described.

JN - Stavebnictví

  • 2008
  • D
Result

EIS and dike of water reservoir monitoring

A few results of dike seepage monitoring by device with electrical impedance spectrometry is shown.

JN - Stavebnictví

  • 2008
  • D
Result

Mathematical model of dike failure due to overtopping at the river Dyje at Breclav

This paper contains the results of a mathematical simulation of breaching of left bank dike of the river Dyje in the city of Breclav in the Czech Republic. The results of modelling are the breach opening development in time and hydrograph of...

JN - Stavebnictví

  • 2013
  • D
Result

Mathematical model of dike failure due to overtopping at the river Dyje at Breclav

This paper contains the results of a mathematical simulation of breaching of left bank dike of the river Dyje in the city of Breclav in the Czech Republic. The results of modelling are the breach opening development in time and hydrograph of...

JN - Stavebnictví

  • 2013
  • Jx
Result

Dike status monitoring by EIS Method

The groundwater level monitoring in the dike.

JN - Stavebnictví

  • 2008
  • Zx
Result

Overtopping of the dike measured with termistor probe

For measurement overtopping the crest of dike was used thermal method - monitorign thermal scalar field in dike material and its changes. It was realized with termistor sensor....

JN - Stavebnictví

  • 1999
  • D
Result

The research of methods of dikes monitoring

New indirect methods for dikes monitoring developing in LWMR.

JN - Stavebnictví

  • 2002
  • M
Result

Termistor's pearls for dike status monitoring

Thermistor probes used for dike status monitoring.

JN - Stavebnictví

  • 2001
  • D
Result

NUMERICAL MODEL OF THE DIKE FAILURE DUE TO OVERTOPPING, THE RIVER OF MORAVA, THE CITY OF HODONIN

This paper presents a mathematical and numerical model of the simulation of dike failure due to overtopping. In this paper we assume a mechanism of the dike failure and the progress of breaching process (breach initiation and breach...

JN - Stavebnictví

  • 2013
  • D
Result

Two Non-Invasive Methods Application in the Dike Monitoring

Two original electrical methods of dikes monitoring are described in detail. Using these methods, the non-stationary movement of the free water level in the dike can be indicated. The methods also enable to detect the piping in the ...

JN - Stavebnictví

  • 2005
  • D
  • 1 - 10 out of 302