All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Filters

75 214 (0,152s)

Result

Combined Heuristic Approach to Resource-Constrained Project Scheduling Problem

This article deals with the resource-constrained project scheduling problem that belongs to NP-hard optimisation problems.

BD - Teorie informace

  • 2010
  • Jx
Result

Scheduling Project with Cyclical Structure: A Comparison of Fuzzy and Probabilistic Approaches

Main topics of the document: project scheduling; fuzzy-GERT; Monte Carlo; cyclical structures; fuzzy approaches; probabilistic approaches......

BB - Aplikovaná statistika, operační výzkum

  • 2010
  • D
Result

SSD graph - a new tool for projects control

the diferences between models and reality in project processing. The relationship between scheduled state and real state of project processing is presented by the means of SSD to visualize and monitor or register structure...

BB - Aplikovaná statistika, operační výzkum

  • 2001
  • Jx
Result

Chemical plant crew optimization by the means of project management techniques.

Basic themes in document: project; resource scheduling; crew optimization.

BB - Aplikovaná statistika, operační výzkum

  • 2000
  • Jx
Result

System for Observing and Monitoring Deviations Between Scheduled and Actual State of A Project

.: The SSD Graph: A Tool for Project Scheduling and Visualization. IEEE Trans. on Eng system developed for project management. This computer program is intended to be like in the firstphase, this program was developed and t...

BB - Aplikovaná statistika, operační výzkum

  • 2001
  • D
Result

Next generation services XPlanning 2

The scope of three subsequent projects contracted by Hewlett Packard Enterprise (HPE) was to research, design and develop a scheduling engine for production scheduling in two plants in the USA. The team used the constraint ...

JC - Počítačový hardware a software

  • 2016
  • Vsouhrn
Result

Next generation services XPlanning 3

The scope of three subsequent projects contracted by Hewlett Packard Enterprise (HPE) was to research, design and develop a scheduling engine for production scheduling in two plants in the USA. The team used the constraint ...

JC - Počítačový hardware a software

  • 2016
  • Vsouhrn
Result

Project plan for automation of medium - scale state map work design processes (procedure of solution of phase II of IP)

Project plan for the solution of automated generalization of a medium-scale state map work. The proposal contains a schedule of activities, project budget, project team and the scope of their activities....

Physical geography

  • 2019
  • O
Result

TSP - System for Observing and Monitoring Deviations Between Scheduled and Actual State of A Project

to describe differences between models and reality in project processing, called TSP (this means "Total Simplification of the Project"). Moreover, there is a new non on percentages of job completion. The main benefits of these idea...

BB - Aplikovaná statistika, operační výzkum

  • 2003
  • D
Result

Simulation support for constructing robust plans related to resource scheduling within service systems

optimal (or rathersuitable suboptimal) plan of project and schedule of resources. related to resource scheduling within service systems using support of computer (i) plan of project - i.e. time quotation of all se...

JO - Pozemní dopravní systémy a zařízení

  • 2011
  • Jx
  • 1 - 10 out of 75 214