All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Filters

7 753 (0,198s)

Result

Disjunctive Graph-based Representation of Job Shop Scheduling Problem

representation is important. In this paper two representations are described: the disjunctive graph-based representation and the preference list-based representation......

BB - Aplikovaná statistika, operační výzkum

  • 2001
  • D
Result

Job Shop Scheduling with Transfer Batches

batches. The presented approach uses a disjunctive graph model, whose size Critical Path Method for computations in this graph. This approach can be integrated into any heuristic method for job shop scheduling which uses t...

BB - Aplikovaná statistika, operační výzkum

  • 2000
  • C
Result

Job Shop Scheduling and Its Fuzzification Based on Operations and Disjunctive Graph Representations

benchmarks from ORLibrary. Here, strategies based on operations and disjunctive graph...

Automation and control systems

  • 2019
  • D
  • Link
Result

Lot Streaming in Job Shop Scheduling

of approach,based on a disjunctive graph model and a modification of the Critical Path shop scheduling which uses the disjunctive graph-based representation and the......

BB - Aplikovaná statistika, operační výzkum

  • 2001
  • D
Result

Modeling Job Shop Scheduling Problem for Real-Life Conditions

This paper describes a model of job shop scheduling, which covers the most frequent conditions of real-life production: assembly and distribution operations, release dates, setup and transfer times, overlapping processes. As a modeling tool we choose...

BB - Aplikovaná statistika, operační výzkum

  • 2002
  • D
Result

Modelling Uncertainty in Production Scheduling Problems

, the choice of problem representation is important. In this paper the disjunctive graph...

BB - Aplikovaná statistika, operační výzkum

  • 2001
  • D
Result

An Implementation View on Job Shop Scheduling Based on CPM

, we deal with job shop scheduling problem (JSSP) in a disjunctive graph-based...

BB - Aplikovaná statistika, operační výzkum

  • 2007
  • D
Result

Incremental Propagation Rules for a Precedence Graph with Optional Activities and Time Windows

Constraint-based scheduling is a powerful tool for solving complex real-life scheduling problems. This paper describes new incremental propagation rules integrating propagation of precedence relations and time windows for activities allocated to a

IN - Informatika

  • 2010
  • Jx
Result

Production Scheduling with Transfer Lots

by means of approach, based on a disjunctive graph and a modification of the Critical...

BB - Aplikovaná statistika, operační výzkum

  • 2001
  • D
Result

Scheduling Job Shops Using Genetic Algorithms and Local Search Framework

This paper provides a comparison of the application of stochastic heuristic techniques (genetic algorithms, simulated annealing and tabu search) to job shop scheduling. It presents computational results achieved for three typical representation schem...

BB - Aplikovaná statistika, operační výzkum

  • 1999
  • D
  • 1 - 10 out of 7 753