All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Filters

28 774 (0,278s)

Result

Combined Heuristic Approach to Resource-Constrained Project Scheduling Problem

This article deals with the resource-constrained project scheduling problem that belongs to NP-hard optimisation problems.

BD - Teorie informace

  • 2010
  • Jx
Result

Production Scheduling with Constrained Resources

This paper deals with a job shop scheduling problem with a view to multiresource production scheduling with resource flexibility. We start from classical scheduling models and modify them with respect to real-life ...

BB - Aplikovaná statistika, operační výzkum

  • 2005
  • D
Result

Solving Resource-Constrained Project Scheduling Problem As a Sequence of Multi-Knapsack Problems

This paper describes a new technique for solving the duration minimization in a resource-constrained network. It is based on a transformation of the resource-constrained project scheduling problem (RCPSP) ...

JC - Počítačový hardware a software

  • 2006
  • D
Result

Solving Resource-Constrained Project Scheduling Problem As a Sequence of Multi-Knapsack Problems

This paper describes a new technique for solving the duration minimization in a resource-constrained network. It is based on a transformation of the resource-constrained project scheduling problem (RCPSP) ...

BB - Aplikovaná statistika, operační výzkum

  • 2006
  • Jx
Result

A Flexible Heuristic Algorithm for Resource-Constrained Project Scheduling

Resource-constrained project scheduling is an NP-hard optimisation problem. There are many different heuristic strategies how to shift activities in time when resource be postponed and investigate the resource<...

BB - Aplikovaná statistika, operační výzkum

  • 2009
  • D
Result

Flexible Heuristics for Project Scheduling with Limited Resources

Resource-constrained project scheduling is an NP-hard optimisation problem. There are many different heuristic strategies how to shift activities in time when resource be postponed and investigate the resource<...

BB - Aplikovaná statistika, operační výzkum

  • 2007
  • Jx
Result

Time Symmetry of Resource Constrained Project Scheduling with General Temporal Constraints and Take-give Resources

The paper studies a lacquer production scheduling problem formulated as a resource constrained project scheduling problem with general temporal constraints (i.e., positive and negative time-lags). This real-world <...

Computer sciences, information science, bioinformathics (hardware development to be 2.2, social aspect to be 5.8)

  • 2017
  • Jimp
  • Link
Result

A Contribution to Shift Algorithms for Resource-Constrained Scheduling with Dynamic Changes

be postponed and investigate the resource-constrained project scheduling problem (RCPSPProject scheduling with limited resources is an NP-hard optimisation problem. There are many different heuristic stra...

BB - Aplikovaná statistika, operační výzkum

  • 2007
  • D
Result

Solving the Resource Constrained Project Scheduling Problem Using the Parallel Tabu Search Designed for the CUDA Platform

The Resource Constrained Project Scheduling Problem, which is considered to be difficult to tackle even for small instances, is a well-known scheduling problem in the operations research domain. To solve the proble...

BB - Aplikovaná statistika, operační výzkum

  • 2015
  • Jx
  • Link
Result

Application of Modern Heuristic Methods to Scheduling

for complex tasks. In the area of the resource constrained project schedulingThe research work in the course of the author's PhD study has been concentrated on applications of modern heuristic techniques to scheduling<...

JC - Počítačový hardware a software

  • 1999
  • Jx
  • 1 - 10 out of 28 774