The capacity of roundabouts.
Project goals
The aim of the proposed project is to analyze the currently used methods for calculating capacity of the roundabouts. The project will analyze the methods used in the Czech Republic as well as the methods used in other EU countries, or if necessary alsothose used in other countries. Through the research, it will be necessary to verify the input presumptions of the currently used methods. Based on the analysis of the theoretical bases of already used methods together with the use of statistical-stochastic analysis of the data obtained from the research, we will try to propose adjustments to the existing and currently used methods, or we will design and propose an absolutely new method.
Keywords
dopravní inženýrstvíkapacita křižovatekdopravní průzkumvýpočtové metodyokružní křižovatky
Public support
Provider
Ministry of Transport
Programme
Safety and economical transport (National programme of research)
Call for proposals
Bezpečná a ekonomická doprava 2 (SMD0200501)
Main participants
—
Contest type
VS - Public tender
Contract ID
306/2004-520-TPV
Alternative language
Project name in Czech
Aktualizace výpočtových modelů pro stanovení kapacity okružních křižovatek
Annotation in Czech
Navrhovaný projekt si klade za cíl analyzovat používané metody výpočtu kapacit okružních křižovatek. Analyzovány budou jak metody používané v ČR, tak metody používané v ostatních státech EU, popřípadě i ve státech dalších. Průzkumy bude nutné ověřit používané vstupní předpoklady používaných metod. Analýzou teoretických východisek již používaných metod a podrobnou statisticko - pravděpodobnostní analýzou údajů získaných průzkumy se pokusit navrhnout úpravu stávajících metod, popřípadě bude navržena metoda zcela nová.
Scientific branches
R&D category
ZV - Basic research
CEP classification - main branch
JO - Land transport systems and equipment
CEP - secondary branch
JM - Structural engineering
CEP - another secondary branch
AP - Municipal, regional and transportation planning
20102 - Construction engineering, Municipal and structural engineering
20104 - Transport engineering
50702 - Urban studies (planning and development)
50703 - Transport planning and social aspects of transport (transport engineering to be 2.1)
Completed project evaluation
Provider evaluation
U - Uspěl podle zadání (s publikovanými či patentovanými výsledky atd.)
Project results evaluation
Continuance of resolution and effects agree with contract. Objective of the treaty was filled, demanded output was processed.
Solution timeline
Realization period - beginning
Jan 1, 2005
Realization period - end
Dec 31, 2008
Project status
U - Finished project
Latest support payment
Feb 1, 2008
Data delivery to CEP
Confidentiality
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Data delivery code
CEP09-MD0-1F-U/01:1
Data delivery date
Jun 30, 2009
Finance
Total approved costs
3,507 thou. CZK
Public financial support
3,481 thou. CZK
Other public sources
0 thou. CZK
Non public and foreign sources
133 thou. CZK
Basic information
Recognised costs
3 507 CZK thou.
Public support
3 481 CZK thou.
99%
Provider
Ministry of Transport
CEP
JO - Land transport systems and equipment
Solution period
01. 01. 2005 - 31. 12. 2008