All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Study for increasing safety of bus passengers aimed for simulation lateral rollover.

Public support

  • Provider

    Ministry of Transport

  • Programme

    Safety and economical transport (National programme of research)

  • Call for proposals

    Bezpečná a ekonomická doprava 2 (SMD0200501)

  • Main participants

  • Contest type

    VS - Public tender

  • Contract ID

    330/2004-520-TPV

Alternative language

  • Project name in Czech

    Studie zvyšování bezpečnosti cestujících v autobusech s hlavním zaměřením na simulování převrácení vozidla

  • Annotation in Czech

    Výzkum nebezpečí poranění cestujících při převrácení základních konstrukčních typů autobusů s použitím simulačních prostředků v kombinaci s reálnými fyzickými zkouškami. Zkoumání vlivu různých variant zádržných systémů na biomechanické parametry cestujících. Porovnání výsledků simulací podle stávající legislativy EHK a ES se simulacemi uvažujícími zahrnutí připravovaných změn.

Scientific branches

  • R&D category

    ZV - Basic research

  • CEP classification - main branch

    JO - Land transport systems and equipment

  • CEP - secondary branch

    JT - Propulsion, engines and fuels

  • CEP - another secondary branch

    AQ - Safety and health protection, safety in operating machinery

  • OECD FORD - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)

    20104 - Transport engineering<br>20301 - Mechanical engineering<br>20704 - Energy and fuels<br>30305 - Occupational health

Completed project evaluation

  • Provider evaluation

    V - Vynikající výsledky projektu (s mezinárodním významem atd.)

  • Project results evaluation

    The process of solution and the results comport with the contract. The aim was filled, required outputs were elaborated.

Solution timeline

  • Realization period - beginning

    Jan 1, 2005

  • Realization period - end

    Dec 31, 2009

  • Project status

    U - Finished project

  • Latest support payment

    May 28, 2009

Data delivery to CEP

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

  • Data delivery code

    CEP10-MD0-1F-U/01:2

  • Data delivery date

    Jul 1, 2010

Finance

  • Total approved costs

    7,990 thou. CZK

  • Public financial support

    5,940 thou. CZK

  • Other public sources

    0 thou. CZK

  • Non public and foreign sources

    2,050 thou. CZK