All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

A systemic approach to reducing the environmental burden in relation to the construction and operation of buildings, with an emphasis on construction and energy aspects

Public support

  • Provider

    Ministry of Environment

  • Programme

    Efficient utilization of energy and renewable energy resources

  • Call for proposals

    Racionální využití energie a obnovitelné přírodní zdroje 1 (SMZP20041I003)

  • Main participants

    EkoWATT

  • Contest type

    VS - Public tender

  • Contract ID

Alternative language

  • Project name in Czech

    Systémový přístup ke snižování zatížení životního prostředí v souvislosti s výstavbou a provozem budov, s důrazem na stavebně-energetické souvislosti

  • Annotation in Czech

    Cílem projektu je výběr optimálních opatření a doporučení pro snižování energetické a materiálové náročnosti společně se snižováním zátěže skleníkovými plyny ve stavebnictví (při výstavbě, rekonstrukcích, provozování i odstraňování staveb). Optimalizace

Scientific branches

  • R&D category

    NV - Nonindustrial research (Applied research excluded Industrial research)

  • CEP classification - main branch

    JE - Non-nuclear power engineering, energy consumption and utilization

  • CEP - secondary branch

  • CEP - another secondary branch

  • OECD FORD - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)

    20704 - Energy and fuels

Completed project evaluation

  • Provider evaluation

    V - Vynikající výsledky projektu (s mezinárodním významem atd.)

  • Project results evaluation

    Results of the project correspond to the assignment and desired technical level and are of great significance to energy saving and using of renewable resources in buildings.

Solution timeline

  • Realization period - beginning

    Jan 1, 2004

  • Realization period - end

    Jan 1, 2005

  • Project status

    U - Finished project

  • Latest support payment

Data delivery to CEP

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

  • Data delivery code

    CEP06-MZP-1I-U/02:1

  • Data delivery date

    Jun 29, 2006

Finance

  • Total approved costs

    2,000 thou. CZK

  • Public financial support

    1,700 thou. CZK

  • Other public sources

    0 thou. CZK

  • Non public and foreign sources

    310 thou. CZK