All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”
7A11094

Metrology for new generation nuclear power plants

Public support

  • Provider

    Ministry of Education, Youth and Sports

  • Programme

  • Call for proposals

    FP6-2005-Energy-4

  • Main participants

  • Contest type

    RP - Co-financing of EC programme

  • Contract ID

    18931/2011-321

Alternative language

  • Project name in Czech

    Metrology for new generation nuclear power plants

  • Annotation in Czech

    Nuclear power will inevitably form part of EU energy strategy, as member states clamour to meet the ambitious target of a 20 % reduction in CO2 emissions by 2020. It remains the leading low-carbon energy technology and a new generation of reactors will further improve efficiency. The environment inside a nuclear reactor requires constant monitoring to maintain safe temperatures and control fission reactions. Taking such measurements is inherently difficult, but the increased operating temperatures of the proposed 'Generation IV' designs will complicate things further. Existing measurement methods may not be accurate at higher temperatures, and existing reactor building materials, coolants and fuels may not operate as desired in the new conditions. Thisproject aims to address the measurement challenges posed by 'Generation IV' designs, by testing temperature measurements and materials for suitability, and ensuring sufficient nuclear data and radiation measurement techniques are available.

Scientific branches

  • R&D category

    AP - Applied research

  • CEP classification - main branch

    JB - Sensors, detecting elements, measurement and regulation

  • CEP - secondary branch

  • CEP - another secondary branch

  • OECD FORD - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)

    20201 - Electrical and electronic engineering

Completed project evaluation

  • Provider evaluation

    U - Uspěl podle zadání (s publikovanými či patentovanými výsledky atd.)

  • Project results evaluation

    This project developed the necessary infrastructure to enable measurement of the parameters associated with new generation nuclear power plants, in the area of materials, temperature, neutron flow, nuclear data and radiometric methods to ensure that energy suppliers and regulators can work towards an energy secure future within a metrology framework.

Solution timeline

  • Realization period - beginning

    Jan 1, 2011

  • Realization period - end

    Aug 31, 2013

  • Project status

    U - Finished project

  • Latest support payment

    Mar 31, 2013

Data delivery to CEP

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

  • Data delivery code

    CEP14-MSM-7A-U/01:1

  • Data delivery date

    Jun 30, 2014

Finance

  • Total approved costs

    802 thou. CZK

  • Public financial support

    802 thou. CZK

  • Other public sources

    0 thou. CZK

  • Non public and foreign sources

    0 thou. CZK