Effective potential methods in beyond-Standard-Model physics
Public support
Provider
Ministry of Education, Youth and Sports
Programme
—
Call for proposals
FP6-2002-Mobility-1
Main participants
Univerzita Karlova / Matematicko-fyzikální fakulta
Contest type
RP - Co-financing of EC programme
Contract ID
MSMT-4045/2015-1
Alternative language
Project name in Czech
Metody efektivního potenciálu ve fyzice za Standardním Modelem
Annotation in Czech
To explore and seYle down the issues related to the apparent gauge dependence of the tunnelling times by inspecting in detail the simplest realizations of the same situation in the realm of sample models such as, e.g., the Abelian Higgs model. In such simplified scenarios the mechanism of the gauge-parameter cancellation in the measurable quantities such as vacuum lifetime should be more accessible to not only a dedicated numerical analysis but, in particular, to a deeper analytic understanding. The role of fermionic degrees of freedom in various frameworks will be explored. To to calculate the full one-loop scalar spectrum of the minimal SO(10) GUT by means of the effective potential methods. To this end, only few rudimentary results have been obtained so far. This information is vital not only for the theoretical assessment of the potential viability of the minimal SO(10) GUT but also for any ultimate quantitative estimate of the proton lifetime. To understand the role of thermal effects in the minimal SO(10) GUT effective potential.
Scientific branches
R&D category
ZV - Basic research
CEP classification - main branch
BF - Elementary particle theory and high energy physics
CEP - secondary branch
—
CEP - another secondary branch
—
OECD FORD - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)
10303 - Particles and field physics
Completed project evaluation
Provider evaluation
U - Uspěl podle zadání (s publikovanými či patentovanými výsledky atd.)
Project results evaluation
This project was being realized in the framework of the MOBILITY Activity that aims primarily on establishing and strenghtening ties with foreign research institutions. The control of particular outputs is not implemented by the evalution committee, but the correctness of allocated finances and the adequacy of their use are checked.
Solution timeline
Realization period - beginning
Feb 1, 2015
Realization period - end
Dec 31, 2016
Project status
U - Finished project
Latest support payment
Feb 15, 2016
Data delivery to CEP
Confidentiality
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Data delivery code
CEP17-MSM-7A-U/02:1
Data delivery date
Jun 28, 2017
Finance
Total approved costs
200 thou. CZK
Public financial support
200 thou. CZK
Other public sources
0 thou. CZK
Non public and foreign sources
0 thou. CZK