Magnetization Dynamics in Topological Insulator/Ferromagnet Heterostructures
Public support
Provider
Ministry of Education, Youth and Sports
Programme
—
Call for proposals
FP6-2005-Mobility-9
Main participants
Univerzita Karlova / Matematicko-fyzikální fakulta
Contest type
RP - Co-financing of EC programme
Contract ID
MSMT-4045/2015-1
Alternative language
Project name in Czech
Dynamika magnetizace v heterostrukturách topologický izolátor/feromagnet
Annotation in Czech
The project is dedicated to fundamental study of magnetization dynamics in heterostructures formed by topological insulator (TI) and ferromagnet (FM). Using a broad range of experimental techniques available, including ultrafast laser spectroscopy, magneto-optical and Hall effect measurement, we will study the influence of surface state in TI on the magnetization in FM. The main aim is to investigate the effect of spin orbit torque in the structures that could lead to a fast non-thermal manipulation with magnetization at low energy dissipation.
Scientific branches
R&D category
ZV - Basic research
CEP classification - main branch
BM - Solid-state physics and magnetism
CEP - secondary branch
—
CEP - another secondary branch
—
OECD FORD - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)
10302 - Condensed matter physics (including formerly solid state physics, supercond.)
Completed project evaluation
Provider evaluation
U - Uspěl podle zadání (s publikovanými či patentovanými výsledky atd.)
Project results evaluation
This project was being realized in the framework of the MOBILITY Activity that aims primarily on establishing and strenghtening ties with foreign research institutions. The control of particular outputs is not implemented by the evalution committee, but the correctness of allocated finances and the adequacy of their use are checked.
Solution timeline
Realization period - beginning
Feb 1, 2015
Realization period - end
Dec 31, 2016
Project status
U - Finished project
Latest support payment
Feb 15, 2016
Data delivery to CEP
Confidentiality
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Data delivery code
CEP17-MSM-7A-U/02:1
Data delivery date
Jun 28, 2017
Finance
Total approved costs
200 thou. CZK
Public financial support
200 thou. CZK
Other public sources
0 thou. CZK
Non public and foreign sources
0 thou. CZK