Advanced roll gap sensors for enhanced hot and cold rolling processes
Public support
Provider
Ministry of Education, Youth and Sports
Programme
—
Call for proposals
—
Main participants
—
Contest type
RP - Co-financing of EC programme
Contract ID
1090/2011-321
Alternative language
Project name in Czech
Advanced roll gap sensors for enhanced hot and cold rolling processes
Annotation in Czech
The project is focused to achieve higher product quality and productivity on rolling mills, it becomes necessary to get a profound knowledge of friction, heat transfers and lubrication in the roll gap. An approach is proposed to develop innovative roll gap sensors to measure simultaneously at the roll-strip interface thermal and mechanical conditions and oil film thickness: different sensor designs are evaluated and compared in hot and cold rolling using laboratory, pilot and industrial mill tests. Finally the sensors, combined with modelling and mill measurements, are used to increase mills productivity (lower roll surface degradation) and to improve product quality (better strip thickness).
Scientific branches
R&D category
ZV - Basic research
CEP classification - main branch
JG - Metallurgy, metal materials
CEP - secondary branch
BJ - Thermodynamics
CEP - another secondary branch
JP - Industrial processes and processing
OECD FORD - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)
20303 - Thermodynamics<br>20501 - Materials engineering<br>20705 - Remote sensing<br>20706 - Marine engineering, sea vessels<br>20707 - Ocean engineering
Completed project evaluation
Provider evaluation
U - Uspěl podle zadání (s publikovanými či patentovanými výsledky atd.)
Project results evaluation
Following the condition that the candidate of financial contribution was evaluated and afterwards selected by international provider in accordance with the rules of the program the Ministry of Education, Youth ans Sports does not realize the evaluation of project results. The project is evaluated only after its approval by an international provider.
Solution timeline
Realization period - beginning
Jul 1, 2010
Realization period - end
Dec 31, 2012
Project status
U - Finished project
Latest support payment
Apr 18, 2012
Data delivery to CEP
Confidentiality
U - Předmět řešení projektu je utajovanou skutečností podle zvláštních právních předpisů nebo je skutečností, jejíž zveřejnění by mohlo ohrozit činnost zpravodajské služby. Údaje o projektu jsou upraveny tak, aby byly zveřejnitelné
Data delivery code
CEP13-MSM-7C-U/01:1
Data delivery date
Jun 28, 2013
Finance
Total approved costs
1,209 thou. CZK
Public financial support
1,209 thou. CZK
Other public sources
0 thou. CZK
Non public and foreign sources
0 thou. CZK