All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”
7E09094

Self-Learning Sheet Metal Forming System

Public support

  • Provider

    Ministry of Education, Youth and Sports

  • Programme

  • Call for proposals

    FP7-NMP-2008-SMALL-2

  • Main participants

  • Contest type

    RP - Co-financing of EC programme

  • Contract ID

    1088/2011-321

Alternative language

  • Project name in Czech

    Self-Learning Sheet Metal Forming System

  • Annotation in Czech

    The automotive and white goods market tends towards individual customer solutions with product variants in small batch production, for which the forming system needs special setups, parameter change in self-learning control systems and high skilled operators. The self-learning sheet metal forming system LearnForm aims at an innovative knowledge-based drawing process with integrated multi sensors and actuators for adapting the control system strategy to changed material properties and product variants. The concept of the project LearnForm bases on the following main ideas: 1) a self-learning sheet metal forming system based on work piece energy and thermal quality control, 2) intelligent drawing dies including multi-sensors, 3) multi die cushion axes with adaptronic force oscillation actuators and 4) an open architecture motion control system extended by self-learning control strategies. Three tasks of self-learning control are the sliding friction, forming and clamping tasks supervised by the energy level with thermo camera quality check. Demonstrators are intelligent drawing dies for automotive and white goods and self-learning process control software with multi criteria optimizing strategies. The industrial leadership is performed by 5 companies (3OEM, 2SME) with their market leader knowledge and product programme. RTD partners co-operate with outstanding applied and basic interdisciplinary research experience. The work packages include simulation, measuring, programming, training and testing tasks. The project consortium has estimated the high RTD risk and total project costs to 5,24MEur. The total project exploitation from 8 partners is estimated to 25MEur in the third year. The impact from the LearnForm results in the European market of knowledge-based sheet forming presses and dies, industrial process control is characterized by an annual increased turnover of 57.4MEur and by annual reduced manufacturing costs in automotive and white goods of 49.9MEur.

Scientific branches

  • R&D category

    AP - Applied research

  • CEP classification - main branch

    JP - Industrial processes and processing

  • CEP - secondary branch

    BC - Theory and management systems

  • CEP - another secondary branch

    JG - Metallurgy, metal materials

  • OECD FORD - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)

    10201 - Computer sciences, information science, bioinformathics (hardware development to be 2.2, social aspect to be 5.8)<br>20501 - Materials engineering<br>20705 - Remote sensing<br>20706 - Marine engineering, sea vessels<br>20707 - Ocean engineering

Completed project evaluation

  • Provider evaluation

    U - Uspěl podle zadání (s publikovanými či patentovanými výsledky atd.)

  • Project results evaluation

    Following the condition that the candidate of financial contribution was evaluated and afterwards selected by international provider in accordance with the rules of the program the Ministry of Education, Youth ans Sports does not realize the evaluation of project results. The project is evaluated only after its approval by an international provider.

Solution timeline

  • Realization period - beginning

    Apr 1, 2009

  • Realization period - end

    Mar 31, 2012

  • Project status

    U - Finished project

  • Latest support payment

    Apr 18, 2012

Data delivery to CEP

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

  • Data delivery code

    CEP13-MSM-7E-U/01:1

  • Data delivery date

    Jun 28, 2013

Finance

  • Total approved costs

    2,895 thou. CZK

  • Public financial support

    2,895 thou. CZK

  • Other public sources

    0 thou. CZK

  • Non public and foreign sources

    0 thou. CZK