Design of composite joints for improved fire robustness
Public support
Provider
Ministry of Education, Youth and Sports
Programme
—
Call for proposals
—
Main participants
—
Contest type
RP - Co-financing of EC programme
Contract ID
1090/2011-321
Alternative language
Project name in Czech
Design of composite joints for improved fire robustness
Annotation in Czech
The objective is to develop a comprehensive component-based design methodology for composite joints against fire, particularly joints between composite beams and the most common composite columns (concrete-filled hollow sections and partially encased open sections). This will enable composite joints to be fire-engineered to the same level as the frame, offering substantial savings while maintaining safety levels. Fire testing is included on composite joint components, isolated composite joints, composite structural subassemblies and demonstration structures, Numerical analyses of temperature development in protected and unprotected composite joint components in natural fires and coupled thermo-structural analyses will foster development of the integrated component-based model, consistent with Eurocode procedures, for composite joints.
Scientific branches
R&D category
ZV - Basic research
CEP classification - main branch
JN - Civil engineering
CEP - secondary branch
JM - Structural engineering
CEP - another secondary branch
JD - Use of computers, robotics and its application
OECD FORD - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)
20101 - Civil engineering<br>20102 - Construction engineering, Municipal and structural engineering<br>20204 - Robotics and automatic control<br>20205 - Automation and control systems
Completed project evaluation
Provider evaluation
U - Uspěl podle zadání (s publikovanými či patentovanými výsledky atd.)
Project results evaluation
Following the condition that the candidate of financial contribution was evaluated and afterwards selected by international provider in accordance with the rules of the program the Ministry of Education, Youth ans Sports does not realize the evaluation of project results. The project is evaluated only after its approval by an international provider.
Solution timeline
Realization period - beginning
Jul 1, 2010
Realization period - end
Jun 30, 2012
Project status
U - Finished project
Latest support payment
Apr 18, 2012
Data delivery to CEP
Confidentiality
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Data delivery code
CEP13-MSM-7C-U/01:1
Data delivery date
Jun 28, 2013
Finance
Total approved costs
4,284 thou. CZK
Public financial support
4,284 thou. CZK
Other public sources
0 thou. CZK
Non public and foreign sources
0 thou. CZK