All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”
7D10002

Inspection and Lifetime Assessment Tool for Arch Structures

Public support

  • Provider

    Ministry of Education, Youth and Sports

  • Programme

    Eurostars

  • Call for proposals

  • Main participants

  • Contest type

    RP - Co-financing of EC programme

  • Contract ID

    511/2011-320

Alternative language

  • Project name in Czech

    Inspection and Lifetime Assessment Tool for Arch Structures

  • Annotation in Czech

    Historical and even new arch bridges all over Europe supporting road and railway structures are not designed for currently required EN-load combinations. The objective of this project is the development of a monitoring and numerical based reliability lifetime assessment device for arch structures.

Scientific branches

  • R&D category

    AP - Applied research

  • CEP classification - main branch

    JM - Structural engineering

  • CEP - secondary branch

  • CEP - another secondary branch

  • OECD FORD - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)

    20102 - Construction engineering, Municipal and structural engineering

Completed project evaluation

  • Provider evaluation

    U - Uspěl podle zadání (s publikovanými či patentovanými výsledky atd.)

  • Project results evaluation

    The project is focused on monitoring a non-linear modeling of masonry arch bridges. The result is monitoring data adjusted version of the ATENA software suitable for modeling of masonry bridge objects based on. The methodology of numerical analysis of arch bridge in the nonlinear FE system ATENA has been verified on practical example of selected real bridge.

Solution timeline

  • Realization period - beginning

    Jan 1, 2010

  • Realization period - end

    Dec 31, 2012

  • Project status

    U - Finished project

  • Latest support payment

    Mar 8, 2012

Data delivery to CEP

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

  • Data delivery code

    CEP13-MSM-7D-U/01:1

  • Data delivery date

    Jun 28, 2013

Finance

  • Total approved costs

    3,746 thou. CZK

  • Public financial support

    1,873 thou. CZK

  • Other public sources

    0 thou. CZK

  • Non public and foreign sources

    1,873 thou. CZK