Flexible, Fast and Future Production Processes
Public support
Provider
Ministry of Education, Youth and Sports
Programme
—
Call for proposals
FP7-NMP-2008-LARGE-2
Main participants
—
Contest type
RP - Co-financing of EC programme
Contract ID
1090/2011-321
Alternative language
Project name in Czech
Flexible, Fast and Future Production Processes
Annotation in Czech
The F3 consortium?s vision is that the EU?s chemical industry?s competitive position would be strongly enhanced if it could operate modular continuous plant (F3 plant) which combines world scale continuous plant efficiency, consistency and scalability with the versatility of batch operation. Our project will deliver such a radically new production mode based on: a) Plug?and?play modular chemical production technology, capable of widespread implementation throughout the chemical industry. This technologyuses generic backbone facilities designed for rapid interfacing with standardized process equipment containers (PEC). The PEC house process equipment assemblies (PEA) composed of intensified process equipment for fast, flexible future chemical production b) Holistic process design methodology applying process intensification concepts and innovative decision tools. This will accelerate process development and provides a substantial reduction in energy consumption, raw material usage and plant v
Scientific branches
R&D category
AP - Applied research
CEP classification - main branch
CI - Industrial chemistry and chemical engineering
CEP - secondary branch
—
CEP - another secondary branch
—
OECD FORD - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)
20401 - Chemical engineering (plants, products)<br>20402 - Chemical process engineering
Completed project evaluation
Provider evaluation
U - Uspěl podle zadání (s publikovanými či patentovanými výsledky atd.)
Project results evaluation
Following the condition that the candidate of financial contribution was evaluated and afterwards selected by international provider in accordance with the rules of the program the Ministry of Education, Youth ans Sports does not realize the evaluation of project results. The project is evaluated only after its approval by an international provider.
Solution timeline
Realization period - beginning
Jun 1, 2010
Realization period - end
May 31, 2013
Project status
U - Finished project
Latest support payment
Mar 20, 2013
Data delivery to CEP
Confidentiality
C - Předmět řešení projektu podléhá obchodnímu tajemství (§ 504 Občanského zákoníku), ale název projektu, cíle projektu a u ukončeného nebo zastaveného projektu zhodnocení výsledku řešení projektu (údaje P03, P04, P15, P19, P29, PN8) dodané do CEP, jsou upraveny tak, aby byly zveřejnitelné.
Data delivery code
CEP14-MSM-7E-U/01:1
Data delivery date
Jun 30, 2014
Finance
Total approved costs
2,161 thou. CZK
Public financial support
2,161 thou. CZK
Other public sources
0 thou. CZK
Non public and foreign sources
0 thou. CZK