Nanoelectronics for an Energy Efficient Electrical Car
Public support
Provider
Ministry of Education, Youth and Sports
Programme
—
Call for proposals
—
Main participants
—
Contest type
RP - Co-financing of EC programme
Contract ID
5008/2011-321
Alternative language
Project name in Czech
Nanoelectronics for an Energy Efficient Electrical Car
Annotation in Czech
The objective of the project is the development of nanoelectronics technologies, devices, circuits architectures and modules for electrical cars/vehicles and demonstration of these modules in a final systems. Emissions from road vehicles have to be reduced substantially in the future. The ultimate goal of most car manufacturers is to get to a completely electric vehicle, protecting the environment from emissions and noise, with alternative on-board energy sources (solar) and connection to the grid. In this context the project is addressing the development of highly efficient electrical vehicles, the battery control, the high-voltage components (IGBTs, high-voltage FETs) and the architectures and subsystems for the electronics of electrical vehicles.
Scientific branches
R&D category
AP - Applied research
CEP classification - main branch
JA - Electronics and optoelectronics
CEP - secondary branch
JB - Sensors, detecting elements, measurement and regulation
CEP - another secondary branch
JE - Non-nuclear power engineering, energy consumption and utilization
OECD FORD - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)
20201 - Electrical and electronic engineering<br>20704 - Energy and fuels
Completed project evaluation
Provider evaluation
U - Uspěl podle zadání (s publikovanými či patentovanými výsledky atd.)
Project results evaluation
The Ministry of Education, Youth and Sports, being the support provider, do not evaluate results of the project. The project implementation is a part of an international project implementation. The project results are evaluated by the international support provider at the level of the whole international consortia in accordance with the criteria set by the respective international programme.
Solution timeline
Realization period - beginning
Mar 1, 2009
Realization period - end
Jun 30, 2012
Project status
U - Finished project
Latest support payment
Mar 12, 2012
Data delivery to CEP
Confidentiality
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Data delivery code
CEP13-MSM-7H-U/01:1
Data delivery date
Jun 28, 2013
Finance
Total approved costs
12,171 thou. CZK
Public financial support
3,862 thou. CZK
Other public sources
0 thou. CZK
Non public and foreign sources
8,212 thou. CZK