All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”
7H11098

Internet of Energy for Electric Mobility

Public support

  • Provider

    Ministry of Education, Youth and Sports

  • Programme

  • Call for proposals

  • Main participants

  • Contest type

    RP - Co-financing of EC programme

  • Contract ID

    MSMT-4317/2013-310

Alternative language

  • Project name in Czech

    Internet of Energy for Electric Mobility

  • Annotation in Czech

    The objective of Internet of Energy (IoE) is to develop hardware, software and middleware for seamless, secure connectivity and interoperability achieved by connecting the Internet with the energy grids. The application of the IoE will be the infrastructure for the electric mobility. The underlying architecture is of distributed Embedded Systems (ESs), combining power electronics, integrated circuits, sensors, processing units, storage technologies, algorithms, and software. The IoE will implement the real time interface between the power network/grid and the Internet. The grid will increasingly rely on smaller, locally distributed electricity generators and storage systems that are based on plug & play principles. Power network devices and loads at the edge (such as electrical vehicles, buildings, electric devices, and home appliances) can be charged or connected on any source of energy being solar, wind, or hydroelectric. Reference designs and ESs architectures for high efficiency innovative smart network systems will be addressed with regard to requirements of compatibility, networking, security, robustness, diagnosis, maintenance, integrated resource management, and selforganization. The future smart grid will converge with the Internet based onstandard interfaces, and a physical infrastructure to support electric mobility and the efficient distribution of power and information. IoE will provide a robust, accessible and programmable platform that creates applications and services facilitating an increased use of renewable energy sources as fast as is feasible in a cost effective manner.

Scientific branches

  • R&D category

    AP - Applied research

  • CEP classification - main branch

    JA - Electronics and optoelectronics

  • CEP - secondary branch

    JB - Sensors, detecting elements, measurement and regulation

  • CEP - another secondary branch

    JC - Computer hardware and software

  • OECD FORD - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)

    20201 - Electrical and electronic engineering<br>20206 - Computer hardware and architecture

Completed project evaluation

  • Provider evaluation

    V - Vynikající výsledky projektu (s mezinárodním významem atd.)

  • Project results evaluation

    The National Funding Authority i.e Ministry of Education, Youth and Sports does not provide the evaluation of the project results. The project implementation is part of the international project and the evaluation proces is carried out by an international provider within all international consortium of researchers and in accordance with the relevant criteria of the international program.

Solution timeline

  • Realization period - beginning

    May 1, 2011

  • Realization period - end

    Apr 30, 2014

  • Project status

    U - Finished project

  • Latest support payment

    Feb 13, 2014

Data delivery to CEP

  • Confidentiality

    U - Předmět řešení projektu je utajovanou skutečností podle zvláštních právních předpisů nebo je skutečností, jejíž zveřejnění by mohlo ohrozit činnost zpravodajské služby. Údaje o projektu jsou upraveny tak, aby byly zveřejnitelné

  • Data delivery code

    CEP15-MSM-7H-U/01:1

  • Data delivery date

    Jul 2, 2015

Finance

  • Total approved costs

    5,851 thou. CZK

  • Public financial support

    4,872 thou. CZK

  • Other public sources

    0 thou. CZK

  • Non public and foreign sources

    979 thou. CZK