Internet of Energy for Electric Mobility
Public support
Provider
Ministry of Education, Youth and Sports
Programme
—
Call for proposals
—
Main participants
—
Contest type
RP - Co-financing of EC programme
Contract ID
MSMT-4317/2013-310
Alternative language
Project name in Czech
Internet of Energy for Electric Mobility
Annotation in Czech
The objective of Internet of Energy (IoE) is to develop hardware, software and middleware for seamless, secure connectivity and interoperability achieved by connecting the Internet with the energy grids. The application of the IoE will be the infrastructure for the electric mobility. The underlying architecture is of distributed Embedded Systems (ESs), combining power electronics, integrated circuits, sensors, processing units, storage technologies, algorithms, and software. The IoE will implement the real time interface between the power network/grid and the Internet. The grid will increasingly rely on smaller, locally distributed electricity generators and storage systems that are based on plug & play principles. Power network devices and loads at the edge (such as electrical vehicles, buildings, electric devices, and home appliances) can be charged or connected on any source of energy being solar, wind, or hydroelectric. Reference designs and ESs architectures for high efficiency innovative smart network systems will be addressed with regard to requirements of compatibility, networking, security, robustness, diagnosis, maintenance, integrated resource management, and selforganization.
Scientific branches
R&D category
AP - Applied research
CEP classification - main branch
JA - Electronics and optoelectronics
CEP - secondary branch
JB - Sensors, detecting elements, measurement and regulation
CEP - another secondary branch
JC - Computer hardware and software
OECD FORD - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)
20201 - Electrical and electronic engineering<br>20206 - Computer hardware and architecture
Completed project evaluation
Provider evaluation
U - Uspěl podle zadání (s publikovanými či patentovanými výsledky atd.)
Project results evaluation
The National Funding Authority i.e Ministry of Education, Youth and Sports does not provide the evaluation of the project results. The project implementation is part of the international project and the evaluation proces is carried out by an international provider within all international consortium of researchers and in accordance with the relevant criteria of the international program.
Solution timeline
Realization period - beginning
May 1, 2011
Realization period - end
Apr 30, 2014
Project status
U - Finished project
Latest support payment
Feb 13, 2014
Data delivery to CEP
Confidentiality
C - Předmět řešení projektu podléhá obchodnímu tajemství (§ 504 Občanského zákoníku), ale název projektu, cíle projektu a u ukončeného nebo zastaveného projektu zhodnocení výsledku řešení projektu (údaje P03, P04, P15, P19, P29, PN8) dodané do CEP, jsou upraveny tak, aby byly zveřejnitelné.
Data delivery code
CEP15-MSM-7H-U/01:1
Data delivery date
Jul 2, 2015
Finance
Total approved costs
7,148 thou. CZK
Public financial support
2,380 thou. CZK
Other public sources
0 thou. CZK
Non public and foreign sources
4,768 thou. CZK