Aerosol metrology for atmospheric science and air quality
Public support
Provider
Ministry of Education, Youth and Sports
Programme
—
Call for proposals
—
Main participants
Český metrologický institut
Contest type
M2 - International cooperation
Contract ID
MSMT-19821/2017-4/8
Alternative language
Project name in Czech
Aerosol metrology for atmospheric science and air quality
Annotation in Czech
The overall aim of the project is to develop and demonstrate methods for traceability and calibration of different aerosol instruments capable of covering the environmentally relevant size range from several nm up to 10 μm and the regulatory relevant mass concentrations (0.1 μg/m³ to 1000 μg/m³) and number concentrations (102 to 106 particles per cm³). The traceability and calibration will consider the above metrics as well as mass concentration and chemistry of particle components. The project also aims to provide the necessary EU wide calibration infrastructure for aerosol instruments.
Scientific branches
R&D category
ZV - Basic research
CEP classification - main branch
BE - Theoretical physics
CEP - secondary branch
—
CEP - another secondary branch
—
OECD FORD - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)
10301 - Atomic, molecular and chemical physics (physics of atoms and molecules including collision, interaction with radiation, magnetic resonances, Mössbauer effect)
Completed project evaluation
Provider evaluation
U - Uspěl podle zadání (s publikovanými či patentovanými výsledky atd.)
Project results evaluation
Following the condition that the candidate of financial contribution was evaluated and afterwards selected by international provider in accordance with the rules of the program the Ministry of Education, Youth ans Sports does not realize the evaluation of project results. The project is evaluated only after its approval by an international provider.
Solution timeline
Realization period - beginning
Jun 1, 2017
Realization period - end
May 31, 2020
Project status
U - Finished project
Latest support payment
Feb 26, 2020
Data delivery to CEP
Confidentiality
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Data delivery code
CEP21-MSM-8B-U/01:1
Data delivery date
Jun 16, 2021
Finance
Total approved costs
2,233 thou. CZK
Public financial support
1,171 thou. CZK
Other public sources
0 thou. CZK
Non public and foreign sources
1,062 thou. CZK