Metrology for nitrogen dioxide
Public support
Provider
Ministry of Education, Youth and Sports
Programme
—
Call for proposals
—
Main participants
Český metrologický institut
Contest type
M2 - International cooperation
Contract ID
MSMT-19821/2017-4/10
Alternative language
Project name in Czech
Metrology for nitrogen dioxide
Annotation in Czech
The overall objective of this project is to deliver a highly accurate SI traceable measurement infrastructure to underpin direct measurements of NO2 concentrations in the atmosphere that meet the Data Quality Objectives (DQOs) established by the World Meteorological Organisation Global Atmospheric Watch (WMO-GAW) Scientific Advisory expert group. The project will increase the accuracy and stability of NO2 reference standards, which is challenging due to the highly reactive nature of NO2. This will require a more comprehensive characterisation of the impurities formed unintentionally during the preparation and development of new methods that are designed to suppress the formation of impurities. New selective spectroscopic NO2 measurement techniques will be developed, characterised and validated with reference to the standard chemiluminescence method.
Scientific branches
R&D category
VV - Exeperimental development
CEP classification - main branch
BK - Liquid mechanics
CEP - secondary branch
—
CEP - another secondary branch
—
OECD FORD - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)
10305 - Fluids and plasma physics (including surface physics)
Completed project evaluation
Provider evaluation
U - Uspěl podle zadání (s publikovanými či patentovanými výsledky atd.)
Project results evaluation
Following the condition that the candidate of financial contribution was evaluated and afterwards selected by international provider in accordance with the rules of the program the Ministry of Education, Youth ans Sports does not realize the evaluation of project results. The project is evaluated only after its approval by an international provider.
Solution timeline
Realization period - beginning
Jun 1, 2017
Realization period - end
May 31, 2020
Project status
U - Finished project
Latest support payment
Feb 26, 2020
Data delivery to CEP
Confidentiality
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Data delivery code
CEP21-MSM-8B-U/01:1
Data delivery date
Jun 16, 2021
Finance
Total approved costs
1,793 thou. CZK
Public financial support
940 thou. CZK
Other public sources
0 thou. CZK
Non public and foreign sources
853 thou. CZK