All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”
8B19005

Flow metering of renewable gases (biogas, biomethane, hydrogen, syngas and mixtures with natural gas)

Public support

  • Provider

    Ministry of Education, Youth and Sports

  • Programme

  • Call for proposals

  • Main participants

    Český metrologický institut

  • Contest type

    M2 - International cooperation

  • Contract ID

    8B19005

Alternative language

  • Project name in Czech

    Flow metering of renewable gases (biogas, biomethane, hydrogen, syngas and mixtures with natural gas)

  • Annotation in Czech

    The overall objective of the project is to increase knowledge about the accuracy and durability of commercially available gas meters after exposure to renewable gases. This should lead to the improvement of existing meter designs and flow calibration standards. The specific objectives of the project are: 1. To assess the typical uses of renewable gas for which the effects on accuracy, costs and life time are not sufficiently known. Furthermore, to define an acceptable range of gas compositions, which will be suitable to support the new “renewable” framework and to list the missing tests which need to be performed during calibration to cover the use of renewable gases with existing gas meters. 2. To develop traceable methods for the type testing and verification of flow meters that are used to measure renewable gas flows in compliance with the requirements of the 2014/32/EU Measuring Instruments Directive and to determine the uncertainty budget. Uncertainties of 1/5 Maximum Permissible Error (MPE) have to be achieved for type testing and 1/3 MPE for field verification. In addition, this project will study and evaluate the integrity of the meters’ internal components, the durability of the materials, the insulation of electronic components and other possible technical issues (dependent on the composition of the evaluated gas). 3. To validate the calibration methods and uncertainty budgets developed for two flow calibration standards via an appropriate inter-laboratory comparison and to carry out type testing procedures for domestic and commercial gas meters with hydrogen. 4. To contribute to the standards revision work in technical committees CEN/TC 237 and OIML TC8/SC7 to ensure that outputs from the project are aligned with their needs, communicated quickly to those developing the standards and to those who will use them, and in a form that can be incorporated into standards at the earliest opportunity.

Scientific branches

  • R&D category

    VV - Exeperimental development

  • OECD FORD - main branch

    10511 - Environmental sciences (social aspects to be 5.7)

  • OECD FORD - secondary branch

    10511 - Environmental sciences (social aspects to be 5.7)

  • OECD FORD - another secondary branch

    10511 - Environmental sciences (social aspects to be 5.7)

  • CEP - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)

    DI - Pollution and air control<br>DJ - Pollution and water control<br>DK - Contamination and decontamination of soil including pesticides<br>DL - Nuclear waste, radioactive pollution and control<br>DM - Solid waste and its control, recycling<br>DO - Protection of landscape

Completed project evaluation

  • Provider evaluation

    U - Uspěl podle zadání (s publikovanými či patentovanými výsledky atd.)

  • Project results evaluation

    Following the condition that the candidate of financial contribution was evaluated and afterwards selected by international provider in accordance with the rules of the program the Ministry of Education, Youth ans Sports does not realize the evaluation of project results. The project is evaluated only after its approval by an international provider.

Solution timeline

  • Realization period - beginning

    Jun 1, 2019

  • Realization period - end

    May 31, 2022

  • Project status

    U - Finished project

  • Latest support payment

    Feb 21, 2022

Data delivery to CEP

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

  • Data delivery code

    CEP23-MSM-8B-U

  • Data delivery date

    Jun 30, 2023

Finance

  • Total approved costs

    1,156 thou. CZK

  • Public financial support

    1,156 thou. CZK

  • Other public sources

    0 thou. CZK

  • Non public and foreign sources

    0 thou. CZK