Investigation of Complex Thick Targets Neutronics for Accelerator Driven Nuclear Power Production
Public support
Provider
Ministry of Education, Youth and Sports
Programme
Promoting the mobility of researchers and workers in the framework of international cooperation in R&D
Call for proposals
—
Main participants
Vysoké učení technické v Brně / Fakulta elektrotechniky a komunikačních technologií
Contest type
M2 - International cooperation
Contract ID
MSMT-9947/2019-2
Alternative language
Project name in Czech
Výzkum neutroniky tlustých komplexních terčů pro urychlovačem řízenou výrobu energie
Annotation in Czech
a) Determine neutron spatial and energy distribution for all proposed targets; simulate neutron transport and fluences to various neutron detectors; determine energy deposition as input for simulation to be performed under c) b) Prepare computation model using two different simulation tools (e.g. MCNPX and GEANT or FLUKA, MARS, CASCADE); c) Determine and simulate temperature distribution around and inside the targets; d) Prepare a joint research project application to the European or international projects’ call.
Scientific branches
R&D category
ZV - Basic research
OECD FORD - main branch
20305 - Nuclear related engineering; (nuclear physics to be 1.3);
OECD FORD - secondary branch
10304 - Nuclear physics
OECD FORD - another secondary branch
20704 - Energy and fuels
CEP - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)
BG - Nuclear, atomic and molecular physics, accelerators<br>JE - Non-nuclear power engineering, energy consumption and utilization<br>JF - Nuclear energy<br>JT - Propulsion, engines and fuels
Completed project evaluation
Provider evaluation
U - Uspěl podle zadání (s publikovanými či patentovanými výsledky atd.)
Project results evaluation
This project was being realized in the framework of the MOBILITY Activity that aims primarily on establishing and strenghtening ties with foreign research institutions. The control of particular outputs is not implemented by the evalution committee, but the correctness of allocated finances and the adequacy of their use are checked.
Solution timeline
Realization period - beginning
Jan 1, 2019
Realization period - end
Dec 31, 2021
Project status
U - Finished project
Latest support payment
Apr 29, 2020
Data delivery to CEP
Confidentiality
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Data delivery code
CEP22-MSM-8J-U
Data delivery date
Jun 30, 2022
Finance
Total approved costs
150 thou. CZK
Public financial support
150 thou. CZK
Other public sources
0 thou. CZK
Non public and foreign sources
0 thou. CZK