New generation networks based on hybrid configuration with integrated passive optical components (NetCom)
Public support
Provider
Ministry of Education, Youth and Sports
Programme
Programme for Funding Multilateral Scientific and Technological Cooperation Projects in the Danube Region
Call for proposals
—
Main participants
Vysoká škola báňská - Technická univerzita Ostrava / Fakulta elektrotechniky a informatiky
Contest type
M2 - International cooperation
Contract ID
-
Alternative language
Project name in Czech
Studium sítí nových generací založených na hybridních konfiguracích s integrovanými vláknově optickými prvky
Annotation in Czech
The NetCom project aims to design new generation networks, such as S-PON (Super-PON), which can increase the scalability and deployment of xPON for access networks. In 2008, a group was created under the IEEE 802.3 Working Group as P802.3cs, which continues to develop this concept under the banner of an international organization, in addition to ITU-T Q2/SG15. This is a development milestone in the field of xPON, and it is based on already established types of xPON networks. The basic attributes of the previous types of PON networks are combined here. Still, with the fact, the new S-PON architecture tries to achieve a range of up to 50 km with customer coverage of up to 1024 end units within a passive optical distribution network. To achieve such a large coverage of subscribers within the S-PON network, it is necessary to use a suitable wave plan for all end customers/units. For this, integrated waveguide optic elements based on the AWG are used, especially C-AWG (Cyclic AWG) or A-AWG (Athermal AWG) if part of the network is installed in outdoor environments. By choosing the right wave plan, we can cover the channel spacing at 100 GHz within the C and L optical bands and achieve coexistence with other types of networks, such as XGS-PON/NGPON.
Scientific branches
R&D category
ZV - Basic research
OECD FORD - main branch
20201 - Electrical and electronic engineering
OECD FORD - secondary branch
—
OECD FORD - another secondary branch
—
CEP - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)
JA - Electronics and optoelectronics<br>JB - Sensors, detecting elements, measurement and regulation
Solution timeline
Realization period - beginning
Jul 1, 2023
Realization period - end
Jun 30, 2025
Project status
K - Ending multi-year project
Latest support payment
Feb 14, 2025
Data delivery to CEP
Confidentiality
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Data delivery code
CEP25-MSM-8X-R
Data delivery date
Mar 5, 2025
Finance
Total approved costs
249 thou. CZK
Public financial support
249 thou. CZK
Other public sources
0 thou. CZK
Non public and foreign sources
0 thou. CZK