N- and S-heteroatoms co-doping in porous carbon gels for electrochemical capacitors
Public support
Provider
Ministry of Education, Youth and Sports
Programme
Programme for Funding Multilateral Scientific and Technological Cooperation Projects in the Danube Region
Call for proposals
—
Main participants
Ostravská univerzita / Přírodovědecká fakulta
Contest type
M2 - International cooperation
Contract ID
-
Alternative language
Project name in Czech
Dopování porézních uhlíkových gelů N a S heteroatomy pro elektrochemické kondenzátory
Annotation in Czech
The main aim of the project is to develop carbon gels co-doped with N and S heteroatoms using sol-gel polymerization route with in-depth understanding of the individual roles and properties of heteroatoms and their functionalities evolved in carbon structure, and their applications in EC electrodes. To achieve the main aim of the project, the following objectives are planned. • Preparation of 3-D gel networks from polymer precursors containing heteroatoms (S, and N), understanding of reaction mechanism, and carbonization to make carbon gels, along with tailoring porosity in carbon nanostructures to suit for EC electrodes. • Study on presence of heteroatoms and their evolution of different linkages or functionalities in carbon matrix along with structural and morphological observations. • Investigating roles of porosity as well as heteroatom co-doping in carbon gels for EC applications
Scientific branches
R&D category
ZV - Basic research
OECD FORD - main branch
10405 - Electrochemistry (dry cells, batteries, fuel cells, corrosion metals, electrolysis)
OECD FORD - secondary branch
21001 - Nano-materials (production and properties)
OECD FORD - another secondary branch
20501 - Materials engineering
CEP - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)
CG - Electrochemistry<br>JG - Metallurgy, metal materials<br>JJ - Other materials<br>JP - Industrial processes and processing
Solution timeline
Realization period - beginning
Jul 1, 2025
Realization period - end
Jun 30, 2027
Project status
Z - Beginning multi-year project
Latest support payment
—
Data delivery to CEP
Confidentiality
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Data delivery code
CEP25-MSM-8X-R
Data delivery date
Aug 6, 2025
Finance
Total approved costs
243 thou. CZK
Public financial support
243 thou. CZK
Other public sources
0 thou. CZK
Non public and foreign sources
0 thou. CZK