All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Asphalt pavement of new generation in the Czech Republic

Public support

  • Provider

    Ministry of Transport

  • Programme

    Optimisation of transport system and its sustainable development

  • Call for proposals

    Optimalizace dopravní soustavy a její udržitelný rozvoj (SMDS200101)

  • Main participants

    EUROVIA CS, a.s.

  • Contest type

    VS - Public tender

  • Contract ID

Alternative language

  • Project name in Czech

    Asfaltové vozovky nové generace v České republice

  • Annotation in Czech

    Cílem řešení je zhodnocení asfaltových směsí a konstrukcí vozovek provedených v minulých letech, návrh zlepšení v konstrukci vozovek, zdokonalení metod měření a hodnocení funkčních vlastností asfaltových směsí (zejména odolnosti proti únavě) a úpravypředpisů.

Scientific branches

  • R&D category

    NV - Nonindustrial research (Applied research excluded Industrial research)

  • CEP classification - main branch

    JO - Land transport systems and equipment

  • CEP - secondary branch

  • CEP - another secondary branch

  • OECD FORD - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)

    20104 - Transport engineering

Completed project evaluation

  • Provider evaluation

    V - Vynikající výsledky projektu (s mezinárodním významem atd.)

  • Project results evaluation

    The goal of the project is the evaluation of realised asphalt mixes and pavements, the proposal of improvements in pavement structures, in testing methods of fundamental mix properties (especially for fatigue) and the changes of existing codes.

Solution timeline

  • Realization period - beginning

    Jan 1, 2001

  • Realization period - end

    Jan 1, 2004

  • Project status

    U - Finished project

  • Latest support payment

Data delivery to CEP

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

  • Data delivery code

    CEP/2005/MD0/MD05CE/U/N/2:1

  • Data delivery date

    Jul 1, 2005

Finance

  • Total approved costs

    4,559 thou. CZK

  • Public financial support

    3,615 thou. CZK

  • Other public sources

    944 thou. CZK

  • Non public and foreign sources

    0 thou. CZK