All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Increase in the safety of the operation on transport routes with the increase of efficiency of the control procedures applied in the technical inspection stations while performing regular technical inspections of cars according to Directive 96/96/ EC.

Public support

  • Provider

    Ministry of Transport

  • Programme

    Branch research

  • Call for proposals

    Podpora realizace udržitelného rozvoje dopravy 2 (SMD02009CG002)

  • Main participants

  • Contest type

    VS - Public tender

  • Contract ID

    277/2008-520-TPV

Alternative language

  • Project name in Czech

    Zvyšování bezpečnosti provozu na dopravních cestách zvýšením účinnosti kontrolních postupů, aplikovaných ve stanicích technických kontrol (dále jen STK) při provádění pravidelných technických prohlídek vozidel dle směrnice 96/96/ ES.

  • Annotation in Czech

    Cílem projektu je navrhnout: 1)systém kontroly nájezdových brzdových soustav přípojných vozidel v STK 2)systém kontroly tlumičů pérování vozidel v STK 3)návrh požadavků pro uskutečňování přenosu dat z válcové zkušebny brzd a regloskopu v STK

Scientific branches

  • R&D category

    AP - Applied research

  • CEP classification - main branch

    JO - Land transport systems and equipment

  • CEP - secondary branch

    AQ - Safety and health protection, safety in operating machinery

  • CEP - another secondary branch

  • OECD FORD - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)

    20104 - Transport engineering<br>30305 - Occupational health

Completed project evaluation

  • Provider evaluation

    U - Uspěl podle zadání (s publikovanými či patentovanými výsledky atd.)

  • Project results evaluation

    Solutions for all sub-projects was based on rigorous analysis and design methods used in testing plans, performing technical inspections of vehicles in selected EU countries and the survey and verification equipment techického SBP in the country.

Solution timeline

  • Realization period - beginning

    Jan 2, 2009

  • Realization period - end

    Dec 31, 2010

  • Project status

    U - Finished project

  • Latest support payment

    Feb 9, 2010

Data delivery to CEP

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

  • Data delivery code

    CEP11-MD0-CG-U/01:1

  • Data delivery date

    Jun 29, 2011

Finance

  • Total approved costs

    3,169 thou. CZK

  • Public financial support

    2,681 thou. CZK

  • Other public sources

    0 thou. CZK

  • Non public and foreign sources

    488 thou. CZK