All
All

What are you looking for?

All
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Intelligent system for analysis and prediction of public transport

Project goals

The project is focused on analysis and prediction of data produced by public transport systems operated within the framework of transport services of integrated transport systems. The uniqueness lies in the use of a combination of data sources of the multimodal planner, dispatching and billing system, the ability to assign transaction and other information to a specific traffic link in real-time driving. The project is planned for 3 years and will produce 6 outputs, which will allow to store, analyze and predict data. It will create a data storage, three SW for data analysis and prediction, a tool for personification of multimodal planning and a SW tool for support of operational and strategic management of public transport. The functionality will be verified by conducting a pilot plant.

Keywords

public transporttraffic planning, analysispredictionsoftware

Public support

  • Provider

    Technology Agency of the Czech Republic

  • Programme

  • Call for proposals

    1.VS DOPRAVA 2020+ (STA02019CK010)

  • Main participants

    CEDA Maps a.s.

  • Contest type

    VS - Public tender

  • Contract ID

    CK01000165 - Smlouva o poskytnutí podpory

Alternative language

  • Project name in Czech

    Inteligentní systém pro analýzu a predikci veřejné dopravy

  • Annotation in Czech

    Projekt je zaměřen na analýzu a predikci dat produkovaných systémy veřejné dopravy běžně provozovaných v rámci dopravní obslužnosti integrovaných dopravních systémů. Unikátnost spočívá ve využití kombinace datových zdrojů multimodálního plánovače, systému dispečinku a zúčtovacího systému, schopnosti přiřazovat transakční a další informace ke konkrétnímu spoji ve skutečném čase jízdy. Projekt je naplánován na tři roky. V rámci projektu vznikne šest výstupů, které umožní data ukládat, analyzovat a predikovat, vznikne tak datové úložiště, tři SW nástroje pro analýzu a predikci dat, nástroj pro personifikaci multimodálního plánování a SW nástroj pro podporu operativního a strategického řízení VD, celé řešení bude v ověřeno provedením poloprovozu.

Scientific branches

  • R&D category

    AP - Applied research

  • OECD FORD - main branch

    50703 - Transport planning and social aspects of transport (transport engineering to be 2.1)

  • OECD FORD - secondary branch

    10201 - Computer sciences, information science, bioinformathics (hardware development to be 2.2, social aspect to be 5.8)

  • OECD FORD - another secondary branch

    20104 - Transport engineering

  • AF - Documentation, librarianship, work with information
    AP - Municipal, regional and transportation planning
    BC - Theory and management systems
    BD - Information theory
    IN - Informatics
    JO - Land transport systems and equipment

Completed project evaluation

  • Provider evaluation

    U - Uspěl podle zadání (s publikovanými či patentovanými výsledky atd.)

  • Project results evaluation

    The project succeeded according to the assignment. However, as part of the analysis, there is a lack of evaluation of changes in the data collection process and their validation, so that the outputs and predictions have a more relevant informative value.

Solution timeline

  • Realization period - beginning

    Jan 1, 2020

  • Realization period - end

    Jun 30, 2023

  • Project status

    U - Finished project

  • Latest support payment

    Feb 28, 2023

Data delivery to CEP

  • Confidentiality

    C - Předmět řešení projektu podléhá obchodnímu tajemství (§ 504 Občanského zákoníku), ale název projektu, cíle projektu a u ukončeného nebo zastaveného projektu zhodnocení výsledku řešení projektu (údaje P03, P04, P15, P19, P29, PN8) dodané do CEP, jsou upraveny tak, aby byly zveřejnitelné.

  • Data delivery code

    CEP24-TA0-CK-U

  • Data delivery date

    Jun 28, 2024

Finance

  • Total approved costs

    23,806 thou. CZK

  • Public financial support

    17,514 thou. CZK

  • Other public sources

    0 thou. CZK

  • Non public and foreign sources

    6,278 thou. CZK

Recognised costs

23 806 CZK thou.

Public support

17 514 CZK thou.

0%


Provider

Technology Agency of the Czech Republic

OECD FORD

Transport planning and social aspects of transport (transport engineering to be 2.1)

Solution period

01. 01. 2020 - 30. 06. 2023