Realization of VUT 081 Kondor aircraft for application of optical monitoring system and its evaluation in real conditions
Project goals
The main target of project is the development and manufacuring of VUT 081 Kondor aircraft and integration of advanced optical monitoring system for industrial networks monitoring and other specific observation aerial works. Whole system will be evaluatedin real conditions. The design of aircraft will follow up the experience with experimental aircraft VUT 001 Marabu. The design will be modified mainly in fuselage, where optical monitoring system and operator seat has to be effectively integrated.
Keywords
Public support
Provider
Ministry of Industry and Trade
Programme
TIP
Call for proposals
TIP 3 (SMPO2011/01)
Main participants
—
Contest type
VS - Public tender
Contract ID
FR-TI3/220
Alternative language
Project name in Czech
Realizace letounu VUT 081 Kondor pro aplikaci optického monitorovacího systému a jeho ověření v reálných podmínkách
Annotation in Czech
Základním cílem navrhovaného projektu je výroba prototypu letounu VUT 081 Kondor a integrace pokročilého optického systému pro monitorování průmyslových síťí a produktovodů, bezpečnostní a dopravní pozorování. Dále pak ověření užitných vlastností celéhosystému na typických modelových misích monitorovacích letů. Návrh letounu bude vycházet z letounu VUT 001 Marabu. Budou provedeny konstrukční úpravy zejména trupu letounu, umožňující efektivní integraci optického monitorovacího systému a pracoviště operátora.
Scientific branches
Completed project evaluation
Provider evaluation
U - Uspěl podle zadání (s publikovanými či patentovanými výsledky atd.)
Project results evaluation
VUT 081 Kondor was developed as the airplane with monitoring systém and there were realised monitoring flights. The results can be implemented as a complete set or as separate sales of monitoring systém, stabilized platform or airplane.
Solution timeline
Realization period - beginning
Jan 1, 2011
Realization period - end
Dec 31, 2014
Project status
U - Finished project
Latest support payment
May 9, 2014
Data delivery to CEP
Confidentiality
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Data delivery code
CEP15-MPO-FR-U/01:1
Data delivery date
Jul 3, 2015
Finance
Total approved costs
44,441 thou. CZK
Public financial support
30,076 thou. CZK
Other public sources
0 thou. CZK
Non public and foreign sources
14,367 thou. CZK
Basic information
Recognised costs
44 441 CZK thou.
Public support
30 076 CZK thou.
67%
Provider
Ministry of Industry and Trade
CEP
JU - Aeronautics, aerodynamics, aeroplanes
Solution period
01. 01. 2011 - 31. 12. 2014