All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Research and optimalisation of metallurgical technologies by means of trace methods.

Public support

  • Provider

    Ministry of Industry and Trade

  • Programme

    TANDEM

  • Call for proposals

    TANDEM 2 (SMPO200500008)

  • Main participants

  • Contest type

    VS - Public tender

  • Contract ID

    FT-TA2/057

Alternative language

  • Project name in Czech

    Výzkum a optimalizace metalurgických technologií pomocí stopovacích metod.

  • Annotation in Czech

    Optimalizace metalurgických technologií na zařízeních plynulého lití oceli pomocí experimentů na bázi stopovacích metod v provozních podmínkách hutí bez narušení toku výroby - jedná se především o stanovení doby setrvání oceli v mezipánvi, stanovení délky směsného pásma a výzkum vlivu vstupních materiálů na tvorbu povrchových vad v předlitcích. Současným cílem je verifikace a kalibrace numerických modelů používaných při plynulém odlévání oceli.

Scientific branches

  • R&D category

    PV - Industrial research

  • CEP classification - main branch

    JG - Metallurgy, metal materials

  • CEP - secondary branch

    DL - Nuclear waste, radioactive pollution and control

  • CEP - another secondary branch

  • OECD FORD - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)

    10511 - Environmental sciences (social aspects to be 5.7)<br>20501 - Materials engineering

Completed project evaluation

  • Provider evaluation

    V - Vynikající výsledky projektu (s mezinárodním významem atd.)

  • Project results evaluation

    New tracer methods were developed and verified for research of steel flow in tundish, estimation of input materials´ influence for formation of surface defects and determination of profile and lenght of liquid core at continous casting of steels.

Solution timeline

  • Realization period - beginning

    May 13, 2005

  • Realization period - end

    Jun 30, 2008

  • Project status

    U - Finished project

  • Latest support payment

    May 7, 2008

Data delivery to CEP

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

  • Data delivery code

    CEP09-MPO-FT-U/02:2

  • Data delivery date

    Apr 14, 2010

Finance

  • Total approved costs

    17,732 thou. CZK

  • Public financial support

    11,310 thou. CZK

  • Other public sources

    0 thou. CZK

  • Non public and foreign sources

    6,422 thou. CZK