All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

Complex system of rehabilitation of soil imperfections outside of building structures by the waste material based new grouting material.

Public support

  • Provider

    Ministry of Industry and Trade

  • Programme

    TANDEM

  • Call for proposals

    TANDEM 3 (SMPO200600002)

  • Main participants

  • Contest type

    VS - Public tender

  • Contract ID

    FT-TA3/139

Alternative language

  • Project name in Czech

    Komplexní systém sanace defektů v zeminách za rubem stavebních konstrukcí novými injektážními hmotami z druhotných surovin.

  • Annotation in Czech

    Výzkum nového progresivního systému sanace defektů a nepřístupných dutin ve stavebních konstrukcích a zeminách s technickými parametry splňujícími požadavky příslušných českých i evropských norem, využívající nové typy injektážních hmot. Nové injektážnímateriály budou realizovány s využitím odpadních surovin jako náhrady přírodních vstupních surovin.

Scientific branches

  • R&D category

    PV - Industrial research

  • CEP classification - main branch

    JN - Civil engineering

  • CEP - secondary branch

    JI - Composite materials

  • CEP - another secondary branch

  • OECD FORD - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)

    20101 - Civil engineering<br>20505 - Composites (including laminates, reinforced plastics, cermets, combined natural and synthetic fibre fabrics; filled composites)

Completed project evaluation

  • Provider evaluation

    U - Uspěl podle zadání (s publikovanými či patentovanými výsledky atd.)

  • Project results evaluation

    New formulae of grouting materials with the substition of by-product were successfully designed. Research works were focused on substiton of filler, bonding and special expansive part of grouting materials.

Solution timeline

  • Realization period - beginning

    May 1, 2006

  • Realization period - end

    Dec 31, 2008

  • Project status

    U - Finished project

  • Latest support payment

    Apr 22, 2008

Data delivery to CEP

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

  • Data delivery code

    CEP09-MPO-FT-U/02:2

  • Data delivery date

    Apr 14, 2010

Finance

  • Total approved costs

    10,334 thou. CZK

  • Public financial support

    5,922 thou. CZK

  • Other public sources

    0 thou. CZK

  • Non public and foreign sources

    4,411 thou. CZK