Unique formwork system with anticorrosion protective function
Project goals
The aim of the proposal is to design a unique formwork elements whose utilization during concreting process and subsequent hardening of concrete will be spontaneous migration of inhibitor to reinforcements. The reinforcement steel passivation performed by inhibitors will ensure the longer service life of reinforced concrete structures. Thus, the priority usage of newly developed formwork elements will be for concrete structures, which are being exploited to an aggressive environmental exposures. During solving the project, an important parameter is to optimize the type of corrosion inhibitor, its quantity and ensuring the chemical affinity of inhibitors to the matrix of formwork elements. The formwork elements based on the silicate based and wood based panel have been selected as the formwork species. Verification of the migration process and evaluation of the inhibitor penetration depth through the capillary structure of the concrete till reaching the reinforcement are the crucial aspects of the project. The method effectiveness will be monitored by the measuring the corrosion process of reinforcements, both performed in the laboratory conditions (applying the accelerated corrosion tests) and at the reference structures in-situ.
Keywords
Public support
Provider
Ministry of Industry and Trade
Programme
TRIO
Call for proposals
TRIO 2 (SMPO201700001)
Main participants
FEVA, s.r.o.
Contest type
VS - Public tender
Contract ID
2017FV20530
Alternative language
Project name in Czech
Unikátní bednící systém s ochrannou protikorozní funkcí
Annotation in Czech
Cílem projektu je navržení unikátních bednících dílců, jejichž využitím při betonáži a následném zatvrdnutí betonu dojde k samovolné migraci inhibitoru k výztužné oceli. Provedenou pasivací výztuže se zajistí dosažení delší životnosti železobetonové konstrukce. Přednostně budou nově vyvinuté bednící dílce využívány pro železobetonové konstrukce, které jsou exploatovány agresivním podmínkám prostředí. Důležitým parametrem v průběhu řešení projektu je optimalizace druhu inhibitoru koroze, jeho množství a zajištění chemické afinity k matrici bednícího dílce. Za druhy bednících dílců jsou zvoleny dílce ztraceného bednění na silikátové bázi a plošný deskový materiál na bázi dřeva. Důležitým aspektem při řešení projektu se jeví ověření migrace a hloubky průniku inhibitoru kapilární strukturou betonu k výztuži z vyvíjených druhů bednících prvků. Účinnost metody bude monitorována sledováním procesu koroze výztuže jak v laboratorních podmínkách (při využití zrychlených testů koroze), tak na referenčních stavbách.
Scientific branches
R&D category
AP - Applied research
CEP classification - main branch
JN - Civil engineering
CEP - secondary branch
JJ - Other materials
CEP - another secondary branch
—
20101 - Civil engineering
20502 - Paper and wood
20503 - Textiles; including synthetic dyes, colours, fibres (nanoscale materials to be 2.10; biomaterials to be 2.9)
21001 - Nano-materials (production and properties)
21002 - Nano-processes (applications on nano-scale); (biomaterials to be 2.9)
Completed project evaluation
Provider evaluation
U - Uspěl podle zadání (s publikovanými či patentovanými výsledky atd.)
Project results evaluation
The outcome of the project is a proven technology for the production of unique formwork parts with increased corrosion resistance, which will be used during concreting and subsequent hardening of the concrete to spontaneously migrate the inhibitor to the reinforcing steel. Verification has occurred on a number of functional samples.
Solution timeline
Realization period - beginning
Jul 1, 2017
Realization period - end
Jun 30, 2021
Project status
U - Finished project
Latest support payment
Mar 23, 2021
Data delivery to CEP
Confidentiality
C - Předmět řešení projektu podléhá obchodnímu tajemství (§ 504 Občanského zákoníku), ale název projektu, cíle projektu a u ukončeného nebo zastaveného projektu zhodnocení výsledku řešení projektu (údaje P03, P04, P15, P19, P29, PN8) dodané do CEP, jsou upraveny tak, aby byly zveřejnitelné.
Data delivery code
CEP22-MPO-FV-U
Data delivery date
Apr 18, 2024
Finance
Total approved costs
18,752 thou. CZK
Public financial support
15,000 thou. CZK
Other public sources
0 thou. CZK
Non public and foreign sources
3,750 thou. CZK
Recognised costs
18 752 CZK thou.
Public support
15 000 CZK thou.
0%
Provider
Ministry of Industry and Trade
CEP
JN - Civil engineering
Solution period
01. 07. 2017 - 30. 06. 2021